• Grid Impact Study

    17.5 MWp – Net metering PV project in Dakahlia Poultry
    Karm Solar
    Scope of work
    Full EPC scope for reverse power protection system including the installation, testing and commissioning of Relays, C.B and the control system.
    Date
    September 11, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Development Consultations

    Development consultations scope for 30 MW Waste Heat recovery project in Helwan Cement factory
    Heidelberg
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. EETC Approval
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –Self -Consumption PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –Self-Consumption PV project in ASCOM
    Taqa Arabia
    Scope of work
    • Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Technical Assistance to the New and Renewable Energy Authority (NREA)

    SOFRECO Consulting
    Scope of work
    • Using Antares simulator to propose generation expansion plan for the electricity sector. This includes providing insights and details in:
    1. Scenarios selections.
    2. New technologies.
    3. Demand projections.
    4. Energy modelling using Antares Simulator software.
    • The scope of work also included implementing and intensive capacity building program for the Renewable Energy Authority professionals on usage of Antares model and know-how of building up scenarios and on the economics of Renewable energy.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    August 30, 2024
  • Zizinia El-Mostakbal Compound

    ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    Date
    August 22, 2024
  • AL FARIDA Hospital, Cairo

    FARIDA HOSPITAL
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    Date
    August 22, 2024
  • Shell Operators Building

    SHELL EGYPT
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Palestinian Embassy

    CUBE CONSUTLANT
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • POLARIS MALL

    KVRD
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Landfills Project

    Centre of Solid Waste
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Sorting/Transfer Station for Ehnasia-beni-suef

    Centre of Solid Waste
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • walk of Cairo Mall

    Bonyan for Development and Trade (Bonyan)
    Scope of work
    1. Design and supervision for Electrical system.
    2. Design and supervision for ELV systems.
    Date
    August 22, 2024
  • Belle Vie Club

    EMAAR EGYPT
    Scope of work
    1. Design Electrical Infrastructure Networks.
    2. Design ELV Infrastructure Networks.
    Date
    August 22, 2024
  • GE LOCOMOTIVES MAINTENANCE WORKSHOP

    Egyptian Railways
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • ALAMEIN LAGOONS

    CHINE STATE CONSTRUCTION ENGRG
    Scope of work
    1. Schematic design for Electrical Networks.
    2. Schematic design for ELV Networks.
    3. Schematic design for Mechanical Networks.
    Date
    August 22, 2024
  • ALTOUS University

    Almotahida Education Group
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    3. Design Mechanical Networks.
    Date
    August 22, 2024
  • Fun Land – AQUA Land, JEDDAH, KSA

    AQUA Land
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Atlantis hotel, JEDDAH, KSA

    ECO ARCH
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA

    ECO ARCH
    Scope of work
    1. Design MEP Infrastructure Networks.
    Date
    August 22, 2024
  • LULU HAFAR AL BATIN, KSA

    EMKE
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • MASAR

    UMM AL QURA DEVELOPMENT AND CONSTRUCTION COMPANY
    Scope of work
    1. Shop drawing for MEP system using BIM Technology.
    2. Design Verifications for MEP Systems.
    Date
    August 22, 2024
  • AL DUWADIMI – AFFIF WTS

    SALINE WATER CONVERSION CORPARATION
    Scope of work
    1. Preparing technical and financial study for MEP works.
    Date
    August 22, 2024
  • AIMAGNA and AIBADAA RESEVOIER, NEOM

    NEOM ALRAWAF
    Scope of work
    1. Design Electrical system using BIM Technology.
    2. Design PV/BESSs system.
    3. Design Infrastructure networks using BIM Technology.
    4. Design ELV/ICT system using BIM Technology.
    Date
    August 22, 2024
  • MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA

    OSUS REAL ESTATE-SIDEMA
    Scope of work
    1. Design Electrical systems.
    2. Design Infrastructure networks.
    3. Design ELV systems.
    Date
    August 22, 2024
  • JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA

    Al Quraishi Engineering
    Scope of work
    1. Design Electrical Infrastructure Networks.
    2. Design Irrigation system.
    3. Design SCADA system.
    Date
    August 22, 2024
  • grand central terminal caverns

    NYC Metropolitan Transportation Authority
    Scope of work
    1. BIM Collaboration and Modelling for BMS system.
    Date
    August 22, 2024
  • Modera Tampa

    Mill Creek Residential Trust
    Scope of work
    1. BIM Collaboration and coordination with MEP trades.
    2. disciplines for proper execution of tender requirements.
    3. Develop the solution for the conflict between the various disciplines.
    Date
    August 22, 2024
  • ALSALAAM BANK UGANDA BRANCH

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • DEWAN HOUSE

    ALBURGE REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • DJIGJIGA TWIN TOWER

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • SALLEN APARTMENTS

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • SOMALIA Mall

    ALBURGE REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Radisson blu Hotel

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • ALSALAAM CITY

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    3. Design Mechanical Networks.
    Date
    August 22, 2024
  • Livestock Management Solution

    IMC
    Scope of work
    Scope of work includes: 1. Digitalize the whole process of importing cows and tell it selling as fresh or frozen meat. 2. Track cows using digital smart tools. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage veterinary medicines and track comsuptions.
    Date
    June 25, 2024
  • Develop Electricity distribution solutions

    Intro Distribution
    Scope of work
    Scope of work includes: 1. Create a powerful electricity distribution system. 2. Integrate smart meters allowing users to track consumption. 3. and integrate payment gateway for online and offline payment. 4. digitalize implementation and maintenance processes for the technical team. 5. Implement CRM for tracking scheduled and non-scheduled maintenance. 6. Automate document control and issuing bills.
    Date
    June 25, 2024
  • Develop laboratory management solution

    Al-Mamlaka Lab
    Scope of work
    Scope of work includes: 1. Establishing an electronic patient file management system. 2. Managing inventory and consumables for each test and linking all transactions with the accounting system to calculate costs and profits. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage users and implement e-signatures for issuing medical reports.
    Date
    June 25, 2024
  • Develop a Unified Platform that connects all business stakeholders

    HighChem
    Scope of work
    Scope of work includes: 1. Establishing an Online Platform that links stores, sales, purchases, production lines, and inventory before and after manufacturing. 2. Enables customers to submit their order requests. Pricing customers offer using automatically generated AI algorithm.
    Date
    June 25, 2024
  • Create a mobile application for excursion-seeking users

    GOOOINGS
    Scope of work
    Scope of work includes: 1. Implement an intermediate platform between excursion suppliers and excursion seekers. 2. Integrate online International payment gateway. 3. Integrate Google Maps to track excursion paths. 4. Automate suppliers’ workflow and reservations.
    Date
    June 25, 2024
  • Digitalize Internal workflow and generate data analytics

    RAKA
    Scope of work
    Scope of work includes: 1. Transform DCC processes into a digital solution. 2. Control the submittals and drawing revisions. 3. Analyze projects’ status and follow pending and needed action drawings. 4. Transform drawing the list creation and approval process into the same digital solution. 5. Link global branches processes and secure files and data sharing.
    Date
    June 25, 2024
  • Develop CMS Platform and Search Tool for Drug interactions

    Pharmed Solutions
    Scope of work
    Scope of work includes: 1. Create a powerful Drug Information Editing Tool. 2. Develop AI Search algorithm to retrieve Drug Interaction Monographs. 3. Integrate data analytics over both customer usage and pharmacists’ edits.
    Date
    June 25, 2024
  • Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    4. Clarence of Disco’s approvals.
    5. Preparing power system studies for the internal network including short-circuit analysis, power quality, transient stability as per petroleum sector requirements and standards.
    6. Design of the earthing system.
    7. Lightning analysis.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project. for DNM textile
    Infinity
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Implementing Of Training Programs

    Engineering Economics
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Time Value of money.
    2. Economic feasibility Vs. Financial feasibility.
    3. Cash flows.
    4. Financial statements.
    5. Financial indicators e.g., IRR, ROE, ROI and NPV.
    6. Using excel to develop financial feasibility study from scratch.
    Date
    June 25, 2024
  • Implementing Of Training Programs

    Economics Of Renewable Energy
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Inertia Response Under High Integration Of Intermittent Resources

    National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
    Scope of work
    1. Stability of the power system.
    2. Concept of inertia in the power system.
    3. Impact of low inertia power system on the stability of the system.
    4. Virtual inertia.
    Date
    June 25, 2024
  • Economics Of Renewable Energy Under Competitive Market Environment

    National and Renewable Energy Authority
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    Alexandria Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    South Delta Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp Net Metering PV - Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp Net Metering PV - Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp Self Consumption PV project - JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal.
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp – Net Metering PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from TAQA Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp – Net Metering PV project for Soma Bay
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp – PPA PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp – Net Metering PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp – Net Metering PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp – Net Metering PV project for COCA COLA Assuit Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Upper Egypt Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp – Net Metering PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS)based on Egyptian Technical Codes and obtain approval from Alexandria Distribution company.
    Date
    June 24, 2024
  • Protection Coordination And Relays Settings In Dina Farms

    6 MWp PV project
    IRSC
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp – Net Metering PV project for Soma Bay
    Soma Bay
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp – Self Consumption PV project for Beity Farm
    Arabian Quadra
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain necessary approvals from The Egyptian Transmission Company.
    Date
    June 24, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall (5 MW capacity)

    Tawakol Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Tawakol Distribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall (8 MW capacity)

    Intro Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Intro istribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Support the Technical and Financial Sustainability of EE and RE sectors

    DAI Human Dynamics
    Scope of work
    • Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices. This includes:
    1. Data collection and data verification.
    2. Building up scenarios for future including projected demands, CO2 emissions, and integration of RE
    3. Recommendations on energy policies.
    4. Training on short term planning (Power system operation) and its impact on the long-term planing.
    5. Integrating new technologies in Egypt e.g., Green Hydrogen, Electric mobility, and water desalination.
    Date
    June 24, 2024
  • Assessment and Review of the Feed-In Tariff in Sudan

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.
    Date
    June 24, 2024
  • Promoting the generation of Electricity from Wind Energy

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing the legal and regulatory framework in Sudan to promote the private investments in the field of renewable energy generation.
    Date
    June 24, 2024
  • Catalysing the Use of Solar Photovoltaic Energy in Iraq

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    1. Developing Net-metering financial modelling.
    2. Developing the technical requirements for connecting PV power plants to national grid.
    3. Perform Capacity Building Programs for Iraqi staff on the technicalities of integrating PV power plants to national grid.
    Date
    June 24, 2024