Our Key Projects
Explore our most impactful projects and see how we’re making a difference
Our Journey in Numbers
Numbers that tell the story of our creativity and dedication.
Countries
Clients
Projects
Services
1.1 GW Solar + 200 MWh BESS (Obelisk)
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow,…Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis and electro-magnetic transient studies) and obtain the […]2.6 GW Shuaibah PV Plant
For the 2.6 GW Shuaibah PV Plant in KSA, ADVEC partnered with CESI to deliver…For the 2.6 GW Shuaibah PV Plant in KSA, ADVEC partnered with CESI to deliver advanced electromagnetic-transient studies as part of the project’s compliance scope. The team completed its full […]Sindalah Power Plant
ADVEC delivered end-to-end electrical engineering and protection solutions for ELAF’s Sindalah Power Plant in KSA.…ADVEC delivered end-to-end electrical engineering and protection solutions for ELAF’s Sindalah Power Plant in KSA. The team completed its technical scope in 2023, performing relay coordination, harmonics analysis for the […]0.92 MWp –PV project for NABQ
TAQA Arabia engaged ADVEC to deliver the grid compliance studies for the 0.92 MWp PV…TAQA Arabia engaged ADVEC to deliver the grid compliance studies for the 0.92 MWp PV project in Nabq. The work took place in 2022 to ensure full alignment with Egypt’s […]1 MWp –PV project for Nissan Automotive Factory
Solar Energy System (SES) partnered with ADVEC to deliver all grid compliance studies for the…Solar Energy System (SES) partnered with ADVEC to deliver all grid compliance studies for the 1 MWp PV installation at Nissan’s automotive facility. The work was completed in 2022, ensuring […]3.9 MWp –PV project for Soma Bay
TAQA Arabia commissioned ADVEC to conduct the electrical integration studies for the 3.9 MWp PV…TAQA Arabia commissioned ADVEC to conduct the electrical integration studies for the 3.9 MWp PV project in Soma Bay. The work was completed in 2022, ensuring the system fully complied […]2MWp –PV project in COCA COLA (Assuit Factory)
ADVEC conducted the electrical compliance and grid impact studies for Coca-Cola Assiut’s 2 MWp PV…ADVEC conducted the electrical compliance and grid impact studies for Coca-Cola Assiut’s 2 MWp PV system. The team ensured the solar installation met national PV regulations and integrated smoothly with […]17.5MWp – PV project for Dakahlia Poultry
ADVEC executed the full grid compliance study for Dakahlia Poultry’s 17.5 MWp PV system. The…ADVEC executed the full grid compliance study for Dakahlia Poultry’s 17.5 MWp PV system. The work ensured smooth integration with the farm’s electrical network and alignment with national PV regulations. […]Grid code compliance and Protection coordination study for 6 MWp PV project in Dina Farms
ADVEC carried out protection coordination and grid compliance studies for the 6 MWp PV project…ADVEC carried out protection coordination and grid compliance studies for the 6 MWp PV project at Dina Farms. The team ensured the medium- and low-voltage protection layers were accurately tuned […]7 MWp –PV project in Beity Farm
ADVEC developed the full compliance and grid impact documentation for the 7 MWp PV project…ADVEC developed the full compliance and grid impact documentation for the 7 MWp PV project at Beity Farm. The team tailored the studies to accommodate agricultural load fluctuations and the […]1.1 MWp PV project in Beni Suef
ADVEC serves as owner’s consultant for Edita’s 1.1 MWp PV project in Beni Suef, guiding…ADVEC serves as owner’s consultant for Edita’s 1.1 MWp PV project in Beni Suef, guiding the project through development, engineering, procurement, installation, and testing stages. The assignment focuses on aligning […]1.2 MWp PV project in Tanakoo Morocco
ADVEC acts as owner’s consultant for Empower New Energy on the 1.2 MWp PV project…ADVEC acts as owner’s consultant for Empower New Energy on the 1.2 MWp PV project in Tanakoo, Morocco, overseeing engineering, procurement, installation, and testing activities. The assignment focuses on aligning […]5 MWp PV project in Saray-Immo Morocco
ADVEC delivers owner’s consultancy services for Empower New Energy on the 5 MWp PV project…ADVEC delivers owner’s consultancy services for Empower New Energy on the 5 MWp PV project in Saray-Immo, Morocco, providing end-to-end oversight across development, engineering, procurement, installation, and testing. The assignment […]1.4 MWp PV project in Sidi-Kasem Morocco
ADVEC acts as Owner’s Consultant for Empower New Energy on the 1.4 MWp solar development…ADVEC acts as Owner’s Consultant for Empower New Energy on the 1.4 MWp solar development in Sidi-Kasem, Morocco. The project forms part of Empower’s wider North African expansion, with a […]1.5 MWp PV project in L’oreal
ADVEC partnered with Empower New Energy to provide owner consultation services for the 1.5 MWp…ADVEC partnered with Empower New Energy to provide owner consultation services for the 1.5 MWp solar project at L’Oréal Egypt’s facility, advancing the company’s sustainability goals and improving energy efficiency […]Grid impact analysis of the Benban project (1645 MWp) PV on the Egyptian national grid
ENERGY MODELLING OFOR SIXTY SCHOOLS IN MADINAH
Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and…Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and Calculation of annual water consumption based on the FTE Method.Wadi Al Safa Villas
Shop drawing for MEP system using BIM Technology with LOD 500.Shop drawing for MEP system using BIM Technology with LOD 500.Exclusive partnership with ACO for Aftersales Support for SUNGROW Inverters
Radisson blu Hotel
Design MEP systems.Design MEP systems.SOMALIA Mall
Design and Coordination for MEP systems using BIM Technology with LOD 350.Design and Coordination for MEP systems using BIM Technology with LOD 350.SALLEN APARTMENTS
Design MEP systems.Design MEP systems.DJIGJIGA TWIN TOWER
Design MEP systems.Design MEP systems.DEWAN HOUSE
Design MEP systems.Design MEP systems.ALSALAAM BANK UGANDA BRANCH
Design MEP systems.Design MEP systems.Modera Tampa
Modelling LOD 400 and Coordination for MEP systems using BIM Technology.Modelling LOD 400 and Coordination for MEP systems using BIM Technology.Grand Central Terminal Caverns
BIM Collaboration and Modelling for BMS system LOD 500.BIM Collaboration and Modelling for BMS system LOD 500.JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA
Design Electrical Infrastructure Networks, Irrigation system. SCADA system.Design Electrical Infrastructure Networks, Irrigation system. SCADA system.MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA
Design Infrastructure networks and MEP inside building.Design Infrastructure networks and MEP inside building.AL DUWADIMI – AFFIF WTS
Preparing technical and financial study for MEP works and infrastructure.Preparing technical and financial study for MEP works and infrastructure.LULU HAFAR AL BATIN, KSA
Design MEP systems.Design MEP systems.Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA
Design MEP Infrastructure Networks.Design MEP Infrastructure Networks.Atlantis hotel, JEDDAH, KSA
Design MEP Systems.Design MEP Systems.Fun Land – AQUA Land, JEDDAH, KSA
Design MEP systems.Design MEP systems.ALTOUS University
Design Infrastructure systems.Design Infrastructure systems.ALAMEIN LAGOONS
Schematic design for Electrical, ELV and Mechanical systems.Schematic design for Electrical, ELV and Mechanical systems.GE LOCOMOTIVES MAINTENANCE WORKSHOP
Design MEP systems.Design MEP systems.Belle Vie Club
Design Infrastructure Networks.Design Infrastructure Networks.Renovation Of Walk Of Cairo Mall
Design and supervision for Electrical and ELV system.Design and supervision for Electrical and ELV system.Sorting/Transfer Station for Ehnasia-beni-suef
Design MEP systems.Design MEP systems.Landfills Project
Design MEP systems.Design MEP systems.POLARIS MALL
Design MEP system.Design MEP system.Palestinian Embassy
Design MEP systems.Design MEP systems.Shell Operators Building
Design MEP systems.Design MEP systems.AL FARIDA Hospital, Cairo
Design MEP systems.Design MEP systems.Zizinia El-Mostakbal Compound
Design Electrical and ELV Infrastructure.Design Electrical and ELV Infrastructure.MAG TOWER
Modelling LOD 400 and Coordination for MEP systems.Modelling LOD 400 and Coordination for MEP systems.MASAR MALL
Modelling LOD 400 and Coordination for MEP systems and shop drawing.Modelling LOD 400 and Coordination for MEP systems and shop drawing.JEDDAH ISLAMIC PORT INTERNATIONAL
Design Infrastructure networks and building MEP systems.Design Infrastructure networks and building MEP systems.EXECUTION OF PARALLEL RUNWAY (PRW) KING SALMAN AIR BASE (CENTRAL SECTOR)
Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.AIMAGNA and AIBADAA RESEVOIER, NEOM
Design MEP systems using BIM Technology with LOD 350.Design MEP systems using BIM Technology with LOD 350.Configuration of new MV protection relay settings and tesing at El Qatamya Cement plant
Earth fault accompanied by inverter failure at Bariq Factory
Medium Voltage Switchgear Fire Accident
500 MWp+ BESS – PV Project (Obelisk)
SCATEC partnered with ADVEC in 2025 to conduct comprehensive grid code compliance and grid impact…SCATEC partnered with ADVEC in 2025 to conduct comprehensive grid code compliance and grid impact studies for the Obelisk Project an ongoing 500+ MWp Battery Energy Storage System (BESS) and […]20 MWp – Self Consumption PV (Misr Cement) – Qena
Solariz and the Egyptian Electricity Transmission Company (EETC) partnered with ADVEC in 2025 to deliver…Solariz and the Egyptian Electricity Transmission Company (EETC) partnered with ADVEC in 2025 to deliver the complete EPC scope for the reverse power protection system at Misr Cement’s 20 MWp […]20 MWp – Self-Consumption PV (Misr Cement) in Minya
ADVEC delivered the full EPC scope for the reverse power protection system at Misr Cement’s…ADVEC delivered the full EPC scope for the reverse power protection system at Misr Cement’s 20 MWp self-consumption PV project in Minya, an ongoing project for Solariz and the Egyptian […]2.5 MWp – PV Project in Soma Bay
ADVEC collaborated with Taqa Arabia on the 2.5 MWp solar PV project in Soma Bay,…ADVEC collaborated with Taqa Arabia on the 2.5 MWp solar PV project in Soma Bay, an ongoing project in 2025, focusing on integrating renewable generation into a coastal grid with […]5 MWp – PV Project in ERC
Solariz commissioned ADVEC to conduct comprehensive grid compliance and impact studies for a 5 MWp…Solariz commissioned ADVEC to conduct comprehensive grid compliance and impact studies for a 5 MWp photovoltaic project within the Egyptian Refining Company (ERC) complex one of Egypt’s largest industrial energy […]1.8 MWp –PV project in Makadi Bay
Solariz mandated ADVEC to deliver the grid code compliance and grid impact studies for a…Solariz mandated ADVEC to deliver the grid code compliance and grid impact studies for a 1.8 MWp photovoltaic project in Makadi Bay, one of Egypt’s premier Red Sea resort destinations. […]1.4 MWp – PV Project in Coca Cola Heliopolis
For TED Solar’s 1.4 MWp PV project in Coca Cola Heliopolis, ADVEC conducted grid code…For TED Solar’s 1.4 MWp PV project in Coca Cola Heliopolis, ADVEC conducted grid code compliance and grid impact studies. The project is ongoing and is being executed in 2025. […]1.3 MWp – PV Project in EVACO
ADVEC conducted the full grid compliance and grid impact study for TED Solar’s 1.3 MWp…ADVEC conducted the full grid compliance and grid impact study for TED Solar’s 1.3 MWp PV project in EVACO, providing a detailed technical assessment that meets the highest industry standards. […]1.4 MWp – PV Project in Alex Panel Factory
ADVEC delivered the full grid code compliance and grid impact study for TED Solar’s 1.4…ADVEC delivered the full grid code compliance and grid impact study for TED Solar’s 1.4 MWp PV project at Alex Panel Factory, providing a rigorous technical assessment known for its […]0.7 MWp –PV project in Malikia
The 0.7 MWp PV project in Malikia achieved seamless grid integration with technical guidance from…The 0.7 MWp PV project in Malikia achieved seamless grid integration with technical guidance from ADVEC, commissioned by TED Solar. The project continues to progress actively. ADVEC is carrying out […]1.7 MWp –PV project in Misr Steel
Ensuring seamless integration into Misr Steel’s power network, ADVEC conducted the comprehensive grid compliance and…Ensuring seamless integration into Misr Steel’s power network, ADVEC conducted the comprehensive grid compliance and impact study for the 1.7 MWp PV project, commissioned by TED Solar. The project remains […]3 MWp –PV project in Sumitomo Electric
For the 3 MWp PV project at Sumitomo Electric, ADVEC orchestrated a full grid compliance…For the 3 MWp PV project at Sumitomo Electric, ADVEC orchestrated a full grid compliance and impact study, commissioned by IRSC, ensuring the solar system integrated smoothly and reliably with […]17.5 MWp –PV project in Beni Suef Cement Factory
As part of Egypt’s industrial shift toward renewable generation, ADVEC delivered a comprehensive grid compliance…As part of Egypt’s industrial shift toward renewable generation, ADVEC delivered a comprehensive grid compliance and impact study for the 17.5 MWp PV installation at Beni Suef Cement Factory, commissioned […]Surge Protection Devices (SPDs) Engineering Study at Suez Oil Processing Company (SOPC)
ADVEC commanded the engineering of SOPC, EMC, and Elsewedy SEDCO’s SPD project, combining technical mastery…ADVEC commanded the engineering of SOPC, EMC, and Elsewedy SEDCO’s SPD project, combining technical mastery with operational excellence. The project remains active. ADVEC is carrying out the work in 2025. […]2.5 MWp – PV Project in El Oriental Weavers (Egypt)
In one of Egypt’s largest manufacturing zones, ADVEC partnered with IRSC to guide El Oriental…In one of Egypt’s largest manufacturing zones, ADVEC partnered with IRSC to guide El Oriental Weavers’ 2.5 MWp solar PV project toward renewable energy integration. The project is currently in […]2.5 MWp – PV Micro-Grid in Ghana
ADVEC supports Ghana’s renewable-energy expansion by serving as both technical consultant and owner’s engineer for…ADVEC supports Ghana’s renewable-energy expansion by serving as both technical consultant and owner’s engineer for Empower New Energy’s 2.5 MWp PV micro-grid. The project is still in progress, and ADVEC […]6 GW – PV Project in Tabuk (Phase III)
ADVEC partnered with Assystem on the 6 GW solar PV project in Tabuk (Phase III),…ADVEC partnered with Assystem on the 6 GW solar PV project in Tabuk (Phase III), one of KSA’s most significant renewable developments. The project reached full completion within the 2025 […]8 MWp – Self Consumption PV project in El-Gouna
In El Gouna, ADVEC worked with Solariz and EETC to execute the 8 MWp self-consumption…In El Gouna, ADVEC worked with Solariz and EETC to execute the 8 MWp self-consumption PV project, delivering the full EPC scope for the reverse-power protection system. The team completed […]1.2 MWp – PV Project in Tunisia
For the 1.2 MWp PV project in Tunisia, ADVEC delivered the full detailed-design engineering package…For the 1.2 MWp PV project in Tunisia, ADVEC delivered the full detailed-design engineering package for Empower New Energy, covering DC and AC systems, interconnection facilities, and the required electrical […]2.5 MWp – PV Project in Abu Qir Fertilizers
ADVEC prepared the grid-code compliance study for the 2.5 MWp solar PV project at Abu…ADVEC prepared the grid-code compliance study for the 2.5 MWp solar PV project at Abu Qir Fertilizers. The team completed the technical work during the 2025 review cycle, ensuring every […]8 GW – PV Project in Tabuk (Phase II)
ADVEC worked with Assystem on the 8 GW solar PV project in Tabuk (Phase II),…ADVEC worked with Assystem on the 8 GW solar PV project in Tabuk (Phase II), a major milestone in KSA’s renewable program. The team completed its role in 2024, focusing […]16 MWp –PV project in Arabia cement
ADVEC performed the grid code compliance and impact studies for Solariz’s 16 MWp PV project…ADVEC performed the grid code compliance and impact studies for Solariz’s 16 MWp PV project at Arabia Cement. The team assessed short-circuit levels, load-flow performance, reactive-power capability, power-quality parameters, and […]1.4 MWp –PV project in Coca Cola Nasr City
ADVEC executed the grid code compliance and grid impact studies for The Solar Company’s 1.4…ADVEC executed the grid code compliance and grid impact studies for The Solar Company’s 1.4 MWp PV project at Coca Cola Nasr City. The team assessed short-circuit levels, load-flow performance, […]1.2 MWp PV Project for L’Oréal
ADVEC, on behalf of Empower New Energy, managed the grid compliance and system integration for…ADVEC, on behalf of Empower New Energy, managed the grid compliance and system integration for the 1.2 MWp PV project for L’Oréal in Egypt, delivering a technically robust solar solution. […]35.5 MWp Selous PV project in Zimbabwe
In Zimbabwe, ADVEC delivered protection solutions for El Sewedy (EETD) in the 35.5 MWp Selous…In Zimbabwe, ADVEC delivered protection solutions for El Sewedy (EETD) in the 35.5 MWp Selous PV Project. The team finished its work in 2024, performing a protection coordination study to […]40 MWp Yeleen PV project in Burkina Faso
ADVEC, on behalf of El Sewedy (EETD) in Burkina Faso, executed the 40 MWp Yeleen…ADVEC, on behalf of El Sewedy (EETD) in Burkina Faso, executed the 40 MWp Yeleen PV Project, delivering high-reliability electrical protection for the plant. The team completed its technical work […]Grid impact analysis of the Benban project (1645 MWp) PV on the Egyptian national grid
For client EETC in Egypt, ADVEC conducted the grid impact analysis for the 1645 MWp…For client EETC in Egypt, ADVEC conducted the grid impact analysis for the 1645 MWp Benban PV Project, ensuring smooth integration of large-scale solar generation into the national network. The […]9 MWp –PV project in Nabq
ADVEC supported Taqa Arabia in Egypt by leading the 9 MWp PV Project in Nabq,…ADVEC supported Taqa Arabia in Egypt by leading the 9 MWp PV Project in Nabq, delivering seamless grid integration and ensuring full regulatory compliance. The team completed its technical scope […]0.8MWp –PV project in Nabq
For Taqa Arabia in Egypt, ADVEC executed the 0.8 MWp PV Project in Nabq, delivering…For Taqa Arabia in Egypt, ADVEC executed the 0.8 MWp PV Project in Nabq, delivering precise electrical analysis and ensuring full grid compliance. The team completed its technical scope in […]35.5 MWp Selous PV project in Zimbabwe
In Zimbabwe, ADVEC delivered the Grid Code Compliance Study for the 35.5 MWp Selous PV…In Zimbabwe, ADVEC delivered the Grid Code Compliance Study for the 35.5 MWp Selous PV Project on behalf of El Sewedy (EETD). The team completed its technical scope in 2023, […]1.9MWp –Self-Consumption PV project in Siemens Factory
ADVEC partnered with Asunim in Egypt to execute the 1.9 MWp self-consumption PV Project at…ADVEC partnered with Asunim in Egypt to execute the 1.9 MWp self-consumption PV Project at the Siemens Factory. The team completed its technical scope in 2023, performing a full grid […]0.8 MWp –Self-Consumption PV project in AFCO Factory
ADVEC executed the 0.8 MWp self-consumption PV Project at AFCO Factory for Asunim in Egypt,…ADVEC executed the 0.8 MWp self-consumption PV Project at AFCO Factory for Asunim in Egypt, delivering full regulatory compliance and ensuring optimal grid performance. The team completed its technical scope […]8 MWp –PV project in ASCOM
ADVEC executed the 8 MWp PV Project at ASCOM for Taqa Arabia in Egypt, delivering…ADVEC executed the 8 MWp PV Project at ASCOM for Taqa Arabia in Egypt, delivering full grid compliance and ensuring seamless integration. The team completed its technical scope in 2023, […]1MWp –Metering PV project for COCA COLA Qaluib Factory
For Solariz Egypt, ADVEC delivered the full electrical compliance package for the 1 MWp metering…For Solariz Egypt, ADVEC delivered the full electrical compliance package for the 1 MWp metering PV system at Coca-Cola’s Qalyuib facility. The team completed its technical scope in 2023, preparing […]1.2 MWp –Self-Consumption PV project in Helwan
ADVEC supported TAQA Arabia in deploying the 1.2 MWp self-consumption PV system in Helwan, delivering…ADVEC supported TAQA Arabia in deploying the 1.2 MWp self-consumption PV system in Helwan, delivering full compliance with national technical standards. The team completed its technical scope in 2023, preparing […]1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
At AOI’s Helwan facility, ADVEC delivered the 1.5 MWp self-consumption PV project in collaboration with…At AOI’s Helwan facility, ADVEC delivered the 1.5 MWp self-consumption PV project in collaboration with the Arab Organization for Industrialization. The team completed its technical scope in 2023, preparing a […]6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
ADVEC worked with Intro Utilities to deliver the 6 MWp self-consumption PV system for Heidelberg…ADVEC worked with Intro Utilities to deliver the 6 MWp self-consumption PV system for Heidelberg Cement in Helwan. The team completed its technical scope in 2023, preparing the required grid […]7 MWp –PV project for JUSHI Fiber Glass Factory
ADVEC partnered with Enara Energy Group to deliver the electrical compliance studies for the 7…ADVEC partnered with Enara Energy Group to deliver the electrical compliance studies for the 7 MWp PV installation at JUSHI Fiberglass Factory. The team completed its technical scope in 2023, […]6 MWp –PV project in Sharm El-Sheikh
For Hassan Allam, ADVEC delivered the electrical compliance and integration studies for the 6 MWp…For Hassan Allam, ADVEC delivered the electrical compliance and integration studies for the 6 MWp PV project in Sharm El-Sheikh. The team completed its technical scope in 2023, preparing a […]5 MWp – PPA PV project in Sharm El-Sheikh
ADVEC supported Intro Utilities in executing the 5 MWp PPA PV project in Sharm El-Sheikh,…ADVEC supported Intro Utilities in executing the 5 MWp PPA PV project in Sharm El-Sheikh, delivering the technical studies required for regulatory approval and reliable system performance. The team completed […]1MWp – PV project for COCA COLA Nasr City Factory
ADVEC supported Solariz Egypt by delivering the grid code compliance and grid impact studies for…ADVEC supported Solariz Egypt by delivering the grid code compliance and grid impact studies for the 1 MWp PV system at Coca-Cola’s Nasr City facility. The scope covered short-circuit calculations, […]15 MW – self-consumption CHP in IPI factory
Interstate (IPI) assigned ADVEC the full protection scope for its 15 MW self-consumption CHP facility…Interstate (IPI) assigned ADVEC the full protection scope for its 15 MW self-consumption CHP facility in Egypt. The assignment was executed in 2023 and covered a complete reverse-power protection engineering […]1 MWp –PV project for Soma Bay
ADVEC led the grid compliance and impact studies for the 1 MWp PV system at…ADVEC led the grid compliance and impact studies for the 1 MWp PV system at Soma Bay as part of the resort’s renewable expansion plan. The team worked in 2022, […]1.1MWp –PV project for COCA COLA Tanta Factory
In 2021, Solariz Egypt assigned ADVEC to deliver the electrical compliance and impact studies for…In 2021, Solariz Egypt assigned ADVEC to deliver the electrical compliance and impact studies for the 1.1 MWp PV system at Coca-Cola’s Tanta facility. ADVEC ensured the PV system aligned […]0.75 MWp –PV project for COCA COLA Alexandria Factory
In 2021, ADVEC completed the grid compliance documentation for Coca-Cola Alexandria’s 0.75 MWp PV system,…In 2021, ADVEC completed the grid compliance documentation for Coca-Cola Alexandria’s 0.75 MWp PV system, ensuring smooth integration with the factory’s sensitive electrical operations. The team performed short-circuit studies, load […]1.1 MWp –PV project for Nissan Automotive Factory
In 2021, ADVEC prepared the electrical compliance package for Nissan Automotive’s 1.1 MWp PV system,…In 2021, ADVEC prepared the electrical compliance package for Nissan Automotive’s 1.1 MWp PV system, ensuring the solar installation operated reliably alongside the plant’s high-demand electrical loads. The team carried […]1.1 MWp –PV project for Robaeya for Textiles
ADVEC conducted the full grid compliance and electrical studies for Robaeya for Textiles’ 1.1 MWp…ADVEC conducted the full grid compliance and electrical studies for Robaeya for Textiles’ 1.1 MWp PV system, ensuring reliable integration with the factory’s variable industrial loads. The team performed short-circuit […]17.5 MWp – Net metering PV project in Dakahlia Poultry
ADVEC executed the full EPC and protection engineering scope for Karm Solar’s 17.5 MWp PV…ADVEC executed the full EPC and protection engineering scope for Karm Solar’s 17.5 MWp PV project, focusing on the complete reverse-power protection system. The team delivered engineering, procurement, installation, testing, […]3 MWp PV project in Cairo
ADVEC acts as owner’s consultant for ABB’s 3 MWp PV project in Cairo, leading oversight…ADVEC acts as owner’s consultant for ABB’s 3 MWp PV project in Cairo, leading oversight across development, engineering, procurement, installation, and testing activities. The assignment focuses on validating design decisions, […]0.5MWp PV project in Cairo
ADVEC provides owner’s consultancy services for Edita’s 0.5 MWp PV project in Cairo, overseeing engineering…ADVEC provides owner’s consultancy services for Edita’s 0.5 MWp PV project in Cairo, overseeing engineering reviews, procurement alignment, site execution, and testing activities. The role centers on safeguarding technical integrity, […]