• Wadi Al Safa Villas

    Residential compound consisted of four types for villas and club house
    Division Engineering Consultants
    Scope of work
    Shop drawing for MEP system using BIM Technology with LOD 500.
    Date
    February 26, 2025
  • ENERGY MODELLING OFOR SIXTY SCHOOLS IN MADINAH

    Ministry Of Education
    Scope of work
    Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and Calculation of annual water consumption based on the FTE Method.
    Date
    February 26, 2025
  • AIMAGNA and AIBADAA RESEVOIER, NEOM

    NEOM ALRAWAF
    Scope of work
    Design MEP systems using BIM Technology with LOD 350.
    Date
    February 26, 2025
  • EXECUTION OF PARALLEL RUNWAY (PRW) KING SALMAN AIR BASE (CENTRAL SECTOR)

    Kabbani Construction Group Special Projects Division
    Scope of work
    Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.
    Date
    February 26, 2025
  • JEDDAH ISLAMIC PORT INTERNATIONAL

    Extension of Jeddah Islamic Port (107,000 m²) with Additional Contactor Cooling and Refrigerated Container Facilities
    CMA CGM
    Scope of work
    Design Infrastructure networks and building MEP systems.
    Date
    February 26, 2025
  • MASAR MALL

    MASAR MALL PROJECT WITH PLOT AREA 6000 M2 CONSISTE OF BASEMENT, STREET LEVEL, MEZZANINE BOULEVARD+ 1ST FLOOR + SECOND FLOOR LOWER ROOF + UPPDER ROOF +5 PODIUMS+HC/TECH. FLOOR+23 TYPICAL FLOOR + ROOF
    MASAR
    Scope of work
    Modelling LOD 400 and Coordination for MEP systems and shop drawing.
    Date
    February 26, 2025
  • MAG TOWER

    MAG TOWER PLOT AREA 4500 M2 CONSISTE OF GROUND +5 PODIUMS+HC/TECH. FLOOR+23 TYPICAL FLOOR + ROOF
    MAG
    Scope of work
    Modelling LOD 400 and Coordination for MEP systems.
    Date
    February 26, 2025
  • Technical Assistance to prepare a long-term power system expansion plan for Syrian National Grid

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.
    Date
    November 4, 2024
  • 1.5 MWp PV project in L’oreal

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • 1.4 MWp PV project in Sidi-Kasem Morocco

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • Grid Impact Study

    2.6 GW Shuaibah PV Plant
    CESI
    Scope of work
    Includes Aggregated model using PSCAD, Bench Marking Study for PSCAD model, andControl Interaction Study as part of the electro-magnetic transient compliance requirements.
    Date
    October 28, 2024
  • Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Chad’s Technical Codes.
    Date
    October 28, 2024
  • Grid Impact Study

    Harmonics study for Siemens Niat 500 MW Wind Project.
    Siemens Energy
    Scope of work
    Calculate the grid equivalent at point of common coupling for different harmonic orders to optimally design and size the harmonic filters (harmonics Polygon).
    Date
    October 28, 2024
  • Grid Impact Study

    16 MWp –PV project in Arabia cement
    Solariz
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    October 28, 2024
  • Development Consultations

    15 MWp CHP for NCMP Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    Technical assessment of 1.5 MW combined heat and power (CHP) Technology in DAMFI Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Heidelberg
    Scope of work
    Includes technical review of the project, Statutory approvals and preparing financial feasibility study.
    Date
    October 28, 2024
  • Grid Impact Study

    15 MW – self consumption CHP in IPI factory
    Interstate (IPI)
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Development Consultations

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    October 27, 2024
  • Grid Impact Study

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Power system inertia response under high integration of intermittent resources

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.
    Date
    October 27, 2024
  • Economics of renewable energy under competitive market environment

    National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
    Scope of work
    Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.
    Date
    October 27, 2024
  • Economics of renewable energy under competitive market environment

    National and Renewable Energy Authority
    Scope of work
    Includes Economic dispatch, Unit Commitment, Spot Market, Marginal prices, Zonal Marginal Prices and Impact of integrating intermittent resources on energy and capacity markets.
    Date
    October 27, 2024
  • Power System analysis for integrating RE resources with grid

    Alexandria Distribution Company
    Scope of work
    The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.
    Date
    October 27, 2024
  • Power System analysis for integrating RE resources with grid

    South Delta Distribution Company
    Scope of work
    The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.
    Date
    October 27, 2024
  • Grid Impact Study

    17.5MWp - PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    September 11, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Grid Impact Study

    30 MW – self consumption waste Heat Recovery in Helwan Cement Factory
    Heidelberg
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –PV project in ASCOM
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Technical Assistance to prepare a long-term power system expansion plan for New and Renewable Energy Authority (NREA)

    SOFRECO Consulting
    Scope of work
    Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Zizinia El-Mostakbal Compound

    ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
    Scope of work
    Design Electrical and ELV Infrastructure.
    Date
    August 22, 2024
  • AL FARIDA Hospital, Cairo

    FARIDA HOSPITAL
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Shell Operators Building

    SHELL EGYPT
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Palestinian Embassy

    CUBE CONSUTLANT
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • POLARIS MALL

    KVRD
    Scope of work
    Design MEP system.
    Date
    August 22, 2024
  • Landfills Project

    Centre of Solid Waste
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Sorting/Transfer Station for Ehnasia-beni-suef

    Centre of Solid Waste
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Renovation Of Walk Of Cairo Mall

    Bonyan for Development and Trade (Bonyan)
    Scope of work
    Design and supervision for Electrical and ELV system.
    Date
    August 22, 2024
  • Belle Vie Club

    EMAAR EGYPT
    Scope of work
    Design Infrastructure Networks.
    Date
    August 22, 2024
  • GE LOCOMOTIVES MAINTENANCE WORKSHOP

    Egyptian Railways
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • ALAMEIN LAGOONS

    CHINE STATE CONSTRUCTION ENGRG
    Scope of work
    Schematic design for Electrical, ELV and Mechanical systems.
    Date
    August 22, 2024
  • ALTOUS University

    Almotahida Education Group
    Scope of work
    Design Infrastructure systems.
    Date
    August 22, 2024
  • Fun Land – AQUA Land, JEDDAH, KSA

    AQUA Land
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Atlantis hotel, JEDDAH, KSA

    This project is located in Jeddah, consisting of main hotel project rear villas and wedding hall. The main hotel tower consists of 3 underground parking floors ,6 mixed use floors,12 administrative floors and 10 residential floors
    ECO ARCH
    Scope of work
    Design MEP Systems.
    Date
    August 22, 2024
  • Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA

    ECO ARCH
    Scope of work
    Design MEP Infrastructure Networks.
    Date
    August 22, 2024
  • LULU HAFAR AL BATIN, KSA

    EMKE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • AL DUWADIMI – AFFIF WTS

    SALINE WATER CONVERSION CORPARATION
    Scope of work
    Preparing technical and financial study for MEP works and infrastructure.
    Date
    August 22, 2024
  • MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA

    OSUS REAL ESTATE-SIDEMA
    Scope of work
    Design Infrastructure networks and MEP inside building.
    Date
    August 22, 2024
  • JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA

    Al Quraishi Engineering
    Scope of work
    Design Electrical Infrastructure Networks, Irrigation system. SCADA system.
    Date
    August 22, 2024
  • Grand Central Terminal Caverns

    NYC Metropolitan Transportation Authority
    Scope of work
    BIM Collaboration and Modelling for BMS system LOD 500.
    Date
    August 22, 2024
  • Modera Tampa

    Modera Tampa is a mixed-use development located in the River Arts District of Tampa, Florida. The project site occupies approximately 2.2 acres
    Mill Creek Residential Trust
    Scope of work
    Modelling LOD 400 and Coordination for MEP systems using BIM Technology.
    Date
    August 22, 2024
  • ALSALAAM BANK UGANDA BRANCH

    ALSALAAM REAL STATE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • DEWAN HOUSE

    ALBURGE REAL STATE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • DJIGJIGA TWIN TOWER

    ALSALAAM REAL STATE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • SALLEN APARTMENTS

    ALSALAAM REAL STATE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • SOMALIA Mall

    ALBURGE REAL STATE
    Scope of work
    Design and Coordination for MEP systems using BIM Technology with LOD 350.
    Date
    August 22, 2024
  • Radisson blu Hotel

    ALSALAAM REAL STATE
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Livestock Management Solution

    IMC
    Scope of work
    Scope of work includes: 1. Digitalize the whole process of importing cows and tell it selling as fresh or frozen meat. 2. Track cows using digital smart tools. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage veterinary medicines and track comsuptions.
    Date
    June 25, 2024
  • Develop Electricity distribution solutions

    Intro Distribution
    Scope of work
    Scope of work includes: 1. Create a powerful electricity distribution system. 2. Integrate smart meters allowing users to track consumption. 3. and integrate payment gateway for online and offline payment. 4. digitalize implementation and maintenance processes for the technical team. 5. Implement CRM for tracking scheduled and non-scheduled maintenance. 6. Automate document control and issuing bills.
    Date
    June 25, 2024
  • Develop laboratory management solution

    Al-Mamlaka Lab
    Scope of work
    Scope of work includes: 1. Establishing an electronic patient file management system. 2. Managing inventory and consumables for each test and linking all transactions with the accounting system to calculate costs and profits. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage users and implement e-signatures for issuing medical reports.
    Date
    June 25, 2024
  • Develop a Unified Platform that connects all business stakeholders

    HighChem
    Scope of work
    Scope of work includes: 1. Establishing an Online Platform that links stores, sales, purchases, production lines, and inventory before and after manufacturing. 2. Enables customers to submit their order requests. Pricing customers offer using automatically generated AI algorithm.
    Date
    June 25, 2024
  • Create a mobile application for excursion-seeking users

    GOOOINGS
    Scope of work
    Scope of work includes: 1. Implement an intermediate platform between excursion suppliers and excursion seekers. 2. Integrate online International payment gateway. 3. Integrate Google Maps to track excursion paths. 4. Automate suppliers’ workflow and reservations.
    Date
    June 25, 2024
  • Digitalize Internal workflow and generate data analytics

    RAKA
    Scope of work
    Scope of work includes: 1. Transform DCC processes into a digital solution. 2. Control the submittals and drawing revisions. 3. Analyze projects’ status and follow pending and needed action drawings. 4. Transform drawing the list creation and approval process into the same digital solution. 5. Link global branches processes and secure files and data sharing.
    Date
    June 25, 2024
  • Develop CMS Platform and Search Tool for Drug interactions

    Pharmed Solutions
    Scope of work
    Scope of work includes: 1. Create a powerful Drug Information Editing Tool. 2. Develop AI Search algorithm to retrieve Drug Interaction Monographs. 3. Integrate data analytics over both customer usage and pharmacists’ edits.
    Date
    June 25, 2024
  • Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), Earthing system design, lightening assessment study, preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project in DNM textile factory
    Infinity
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Implementing Of Training Programs

    Engineering Economics
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Time Value of money.
    2. Economic feasibility Vs. Financial feasibility.
    3. Cash flows.
    4. Financial statements.
    5. Financial indicators e.g., IRR, ROE, ROI and NPV.
    6. Using excel to develop financial feasibility study from scratch.
    Date
    June 25, 2024
  • Implementing Of Training Programs

    Economics Of Renewable Energy
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Inertia Response Under High Integration Of Intermittent Resources

    National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
    Scope of work
    1. Stability of the power system.
    2. Concept of inertia in the power system.
    3. Impact of low inertia power system on the stability of the system.
    4. Virtual inertia.
    Date
    June 25, 2024
  • Economics Of Renewable Energy Under Competitive Market Environment

    National and Renewable Energy Authority
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    Alexandria Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    South Delta Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project for JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan.
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp –PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp –PV project for Soma Bay
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp –PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp - PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp –PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp –PV project in COCA COLA (Assuit Factory)
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp –Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp –PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    Grid code compliance and Protection coordination study for 6 MWp PV project in Dina Farms
    IRSC
    Scope of work
    Preparing the protection Coordination and relay settings studies for M.V and L.V network and preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Soma Bay
    Soma Bay
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project in Beity Farm
    Arabian Quadra
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall

    5 MW capacity
    Tawakol Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall

    8 MW capacity
    Intro Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024
  • Support the Technical and Financial Sustainability of EE and RE sectors

    DAI Human Dynamics
    Scope of work
    Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices and performing short-term planning for the power system to validate the reliability and security of the power system.
    Date
    June 24, 2024
  • Assessment and Review of the Feed-In Tariff in Sudan

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.
    Date
    June 24, 2024
  • Promoting the generation of Electricity from Wind Energy

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing a regulatory framework in Sudan to promote the private investments in the field of renewable energy generation, technical and financial assessment of the adopted Feed-in Tariff scheme for the RE projects.
    Date
    June 24, 2024
  • Catalysing the Use of Solar Photovoltaic Energy in Iraq

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing Net-metering financial modelling, Developing the technical requirements for connecting PV power plants to national grid and providing a capacity building program for national staff.
    Date
    June 24, 2024

Codes and Regulations

• Uniform Plumbing Code (UPC).
• International Plumbing Code (IPC).
• ASPE handbooks.
• CIBSE handbooks.

Codes and Regulations

Software

• Water Cad program.
• Sewer Cadprogram.
• Auto cadprogram.
• Revit MEP program.

Codes and Regulations

• NFPA 72
• BS
• TIA/EIA
• ISO/IEC
• EN

Codes and Regulations

Software

• Ansys Acoustics Analysis.
• Acrylic WiFi Heatmaps.
• Auto Cad.
• Revit MEP.
• Civil 3D.

Codes and Regulations

• International Electrical Code (IEC).
• National Electrical Code (NEC).
• British Standards (BS).
• KAHRAMAA(Qatar).
• DEWA (Dubai).
• SEC(KSA).

Codes and Regulations

Software

• ETAP.
• Dialux.
• ETS (KNX).
• Dialux Evo.
• Auto Cad.
• Revit MEP.

Codes and Regulations

• NFPA 10 (portable re extinguishers).
• NFPA 12 (CO2 Systems).
• NFPA 13 (sprinkler systems).
• NFPA 14 (standpipe systems).
• NFPA 16 (foam systems).
• NFPA 20 (re pumps).
• NFPA (clean agent systems).

Codes and Regulations

Software

• Elite Software.
• Auto cad program.
• Revit MEP program.

Codes and Regulations

• ISO 19650 – BIM organization and digitization.
• BS 1192 / PAS 1192 – BIM Level 2 standards.
• IFC (Industry Foundation Classes) – Data exchange standard.
• COBie (Construction Operations Building Information Exchange) – FM integration.
• NBIMS (National BIM Standard - US) – BIM guidelines.
• AIA BIM Guide (E202, E203) – American BIM standards.

Codes and Regulations

Software

• Autodesk Revit MEP modeling.
• Tekla Structures – Structural BIM.
• Autodesk Navisworks – Clash detection.
• Autodesk BIM 360 – Cloud-based BIM collaboration.
• EnergyPlus / Autodesk Insight – Energy analysis.
• Scan to BIM – Laser scanning conversion.
• Autodesk InfraWorks – Infrastructure and urban planning BIM.
• Civil 3D – Civil engineering design and analysis.

Codes and Regulations

• ASHRAE handbooks.
• ASHRAE standards.
• NFPA (smoke evacuation systems).
• SMACNA standards.
• British Standards.
• CIBSE Handbooks.

Codes and Regulations

Software

• HAP (hourly analysis program).
• HVAC solution.
• Contum.
• CFD analysis software.
• Auto cad.
• Magicad 2011.
• Revit MEP.

Codes and Regulations

• ASHRAE 90.1, ASHRAE 62.1, ASHRAE 55 – for energy efficiency, indoor air quality, and thermal comfort.
• IEC, IEEE, NFPA, NEC – for electrical system safety and reliability.
• CIBSE, IBC, BS EN, Eurocodes – for mechanical and structural engineering compliance.
• ISO 50001, ISO 14001 – for energy management and environmental sustainability.

Codes and Regulations

Software

• Carrier HAP.
• IES-VE.
• eQUEST.
• DesignBuilder.
• TRNSYS.