In 2021, Solariz Egypt assigned ADVEC to deliver the electrical compliance and impact studies for the 1.1 MWp PV system at Coca-Cola’s Tanta facility. ADVEC ensured the PV system aligned with the factory’s existing grid and operated efficiently.
The project is accomplished. ADVEC analyzed short-circuit currents, load flow, reactive power, power quality, and transient response. These actions secured reliable and fully compliant PV operation.









