In Zimbabwe, ADVEC delivered the Grid Code Compliance Study for the 35.5 MWp Selous PV Project on behalf of El Sewedy (EETD). The team completed its technical scope in 2023, analyzing reactive power capability, power quality, short-circuit levels, load flow, and transient behavior to align the system with national technical standards.
The project reached full completion after ADVEC finalized all assessments and recommendations, marking it as an accomplished milestone for industrial solar integration. These studies enabled the PV plant to operate reliably and efficiently, providing a robust framework for safe and high-performance energy generation.