For Hassan Allam, ADVEC delivered the electrical compliance and integration studies for the 6 MWp PV project in Sharm El-Sheikh. The team completed its technical scope in 2023, preparing a grid code compliance study tailored to the Red Sea region’s network conditions.
The project reached full completion after ADVEC finalized all analyses, confirming it as an accomplished project. Engineers conducted a full grid impact study covering short-circuit scenarios, load flow behavior, reactive power performance, power quality, and transient response, ensuring stable operation under changing solar conditions.









