ADVEC partnered with Enara Energy Group to deliver the electrical compliance studies for the 7 MWp PV installation at JUSHI Fiberglass Factory. The team completed its technical scope in 2023, ensuring full alignment with Egypt’s grid regulations and the factory’s industrial load profile.
The project reached full completion after ADVEC finalized all technical approvals, marking it as an accomplished project. Engineers carried out a complete grid impact study covering short-circuit levels, load flow behavior, reactive power capability, power quality performance, and transient response, securing reliable and compliant plant operation.