ADVEC worked with Intro Utilities to deliver the 6 MWp self-consumption PV system for Heidelberg Cement in Helwan. The team completed its technical scope in 2023, preparing the required grid code compliance study for regulatory approval.
The project reached full completion after ADVEC finalized all studies, confirming it as an accomplished project. Engineers carried out grid impact studies covering short-circuit levels, load flow, reactive power, power quality, and transient behavior, ensuring stable PV operation within the cement plant’s electrical network.