Interstate (IPI) assigned ADVEC the full protection scope for its 15 MW self-consumption CHP facility in Egypt. The assignment was executed in 2023 and covered a complete reverse-power protection engineering package tailored to a complex industrial configuration.
The project is accomplished. ADVEC designed the protection philosophy, engineered relay logic and breaker coordination, and delivered a fully integrated control scheme. The work strengthened operational reliability, eliminated back-feeding risks, and ensured stable CHP performance under all operating modes.









