Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.

JEDDAH ISLAMIC PORT INTERNATIONAL
February 26, 2025
AIMAGNA and AIBADAA RESEVOIER, NEOM
February 26, 2025EXECUTION OF PARALLEL RUNWAY (PRW) KING SALMAN AIR BASE (CENTRAL SECTOR)
2024
KSA
Kabbani Construction Group Special Projects Division
Our Work by numbers
Projects
Countries
Clients
Services
Other Projects
Wadi Al Safa Villas
Shop drawing for MEP system using BIM Technology with LOD 500.Shop drawing for MEP system using BIM Technology with LOD 500.ENERGY MODELLING OFOR SIXTY SCHOOLS IN MADINAH
Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and…Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and Calculation of annual water consumption based on the FTE Method.AIMAGNA and AIBADAA RESEVOIER, NEOM
Design MEP systems using BIM Technology with LOD 350.Design MEP systems using BIM Technology with LOD 350.







