ADVEC led the grid compliance and impact studies for the 1 MWp PV system at Soma Bay as part of the resort’s renewable expansion plan. The team worked in 2022, confirming the system met all technical and regulatory standards for integration with the local grid.
The project is accomplished. ADVEC conducted short-circuit analysis, load flow modeling, reactive power checks, power quality assessments, and transient simulations. These steps guaranteed stable operation and smooth connection with the resort’s electrical network.









