ADVEC supported Solariz Egypt by delivering the grid code compliance and grid impact studies for the 1 MWp PV system at Coca-Cola’s Nasr City facility. The scope covered short-circuit calculations, load flow analysis, reactive power capability checks, power quality assessment, and transient performance evaluation. The work was executed in 2023 to support safe and compliant grid connection.
The project is accomplished, enabling stable solar generation while maintaining uninterrupted factory operations and full compliance with Egyptian grid regulations.









