Explore our portfolio of groundbreaking projects that showcase our commitment to quality, dedication, and client satisfaction.

We are thrilled to share our remarkable success!

+40

Projects

+5

Countries

Clients-dark-small
+25

Clients

+4

Services

Highlighted Projects

We think that we are all partners in each single success that we have been achieving since the establishment of ADVEC in 2018

All Projects

  • Zizinia El-Mostakbal Compound

    ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    Date
    August 22, 2024
  • AL FARIDA Hospital, Cairo

    FARIDA HOSPITAL
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    Date
    August 22, 2024
  • Shell Operators Building

    SHELL EGYPT
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Palestinian Embassy

    CUBE CONSUTLANT
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • POLARIS MALL

    KVRD
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Landfills Project

    Centre of Solid Waste
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Sorting/Transfer Station for Ehnasia-beni-suef

    Centre of Solid Waste
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • walk of Cairo Mall

    Bonyan for Development and Trade (Bonyan)
    Scope of work
    1. Design and supervision for Electrical system.
    2. Design and supervision for ELV systems.
    Date
    August 22, 2024
  • Belle Vie Club

    EMAAR EGYPT
    Scope of work
    1. Design Electrical Infrastructure Networks.
    2. Design ELV Infrastructure Networks.
    Date
    August 22, 2024
  • GE LOCOMOTIVES MAINTENANCE WORKSHOP

    Egyptian Railways
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • ALAMEIN LAGOONS

    CHINE STATE CONSTRUCTION ENGRG
    Scope of work
    1. Schematic design for Electrical Networks.
    2. Schematic design for ELV Networks.
    3. Schematic design for Mechanical Networks.
    Date
    August 22, 2024
  • ALTOUS University

    Almotahida Education Group
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    3. Design Mechanical Networks.
    Date
    August 22, 2024
  • Fun Land – AQUA Land, JEDDAH, KSA

    AQUA Land
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Atlantis hotel, JEDDAH, KSA

    ECO ARCH
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA

    ECO ARCH
    Scope of work
    1. Design MEP Infrastructure Networks.
    Date
    August 22, 2024
  • LULU HAFAR AL BATIN, KSA

    EMKE
    Scope of work
    1. Design Electrical system.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • MASAR

    UMM AL QURA DEVELOPMENT AND CONSTRUCTION COMPANY
    Scope of work
    1. Shop drawing for MEP system using BIM Technology.
    2. Design Verifications for MEP Systems.
    Date
    August 22, 2024
  • AL DUWADIMI – AFFIF WTS

    SALINE WATER CONVERSION CORPARATION
    Scope of work
    1. Preparing technical and financial study for MEP works.
    Date
    August 22, 2024
  • AIMAGNA and AIBADAA RESEVOIER, NEOM

    NEOM ALRAWAF
    Scope of work
    1. Design Electrical system using BIM Technology.
    2. Design PV/BESSs system.
    3. Design Infrastructure networks using BIM Technology.
    4. Design ELV/ICT system using BIM Technology.
    Date
    August 22, 2024
  • MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA

    OSUS REAL ESTATE-SIDEMA
    Scope of work
    1. Design Electrical systems.
    2. Design Infrastructure networks.
    3. Design ELV systems.
    Date
    August 22, 2024
  • JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA

    Al Quraishi Engineering
    Scope of work
    1. Design Electrical Infrastructure Networks.
    2. Design Irrigation system.
    3. Design SCADA system.
    Date
    August 22, 2024
  • grand central terminal caverns

    NYC Metropolitan Transportation Authority
    Scope of work
    1. BIM Collaboration and Modelling for BMS system.
    Date
    August 22, 2024
  • Modera Tampa

    Mill Creek Residential Trust
    Scope of work
    1. BIM Collaboration and coordination with MEP trades.
    2. disciplines for proper execution of tender requirements.
    3. Develop the solution for the conflict between the various disciplines.
    Date
    August 22, 2024
  • ALSALAAM BANK UGANDA BRANCH

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • DEWAN HOUSE

    ALBURGE REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • DJIGJIGA TWIN TOWER

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • SALLEN APARTMENTS

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • SOMALIA Mall

    ALBURGE REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • Radisson blu Hotel

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical systems.
    2. Design ELV systems.
    3. Design Plumbing and Firefighting systems.
    4. Design HVAC system.
    Date
    August 22, 2024
  • ALSALAAM CITY

    ALSALAAM REAL STATE
    Scope of work
    1. Design Electrical Networks.
    2. Design ELV Networks.
    3. Design Mechanical Networks.
    Date
    August 22, 2024
  • Implementing Of Training Programs

    Engineering Economics
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Time Value of money.
    2. Economic feasibility Vs. Financial feasibility.
    3. Cash flows.
    4. Financial statements.
    5. Financial indicators e.g., IRR, ROE, ROI and NPV.
    6. Using excel to develop financial feasibility study from scratch.
    Date
    June 25, 2024
  • Implementing Of Training Programs

    Economics Of Renewable Energy
    Faculty of Engineering- Ain shams University
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Inertia Response Under High Integration Of Intermittent Resources

    National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
    Scope of work
    1. Stability of the power system.
    2. Concept of inertia in the power system.
    3. Impact of low inertia power system on the stability of the system.
    4. Virtual inertia.
    Date
    June 25, 2024
  • Economics Of Renewable Energy Under Competitive Market Environment

    National and Renewable Energy Authority
    Scope of work
    1. Economic dispatch.
    2. Unit Commitment.
    3. Spot Market.
    4. Marginal prices.
    5. Zonal Marginal Prices.
    6. Impact of integrating intermittent resources on energy and capacity markets.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    Alexandria Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024
  • Power System Aspects Of Integrating PV Projects To The National Grid

    South Delta Distribution Company
    Scope of work
    1. Dynamic user defined models of PV inverters.
    2. Transient and Dynamic response of the PV power plants.
    3. Power quality aspects of the PV power Plants.
    4. P-Q capability Curve of the inverters.
    Date
    June 25, 2024