Explore our portfolio of groundbreaking projects that showcase our commitment to quality, dedication, and client satisfaction.

We are thrilled to share our remarkable success!

+80

Projects

+8

Countries

Clients-dark-small
+45

Clients

+9

Services

Highlighted Projects

We think that we are all partners in each single success that we have been achieving since the establishment of ADVEC in 2018

Grid Stability Study

1.45 GWp PV Project

Egyptian Electricity Transmission Company (EETC)

SCOPE OF WORK

The scope of work includes the following:

  •  Optimum design of the interconnection facilities with the HV network.
  • All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
  • HV substation design.

Benban

Aswan - Egypt

2022 - 2024

Control Interaction Study

800 MWp and 1800 MWp

Centro Elettrotecnico Sperimentale Italiano (CESI)

SCOPE OF WORK

The scope of work includes the following:

  •  Optimum design of the interconnection facilities with the HV network.
  • All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
  • HV substation design.

Al Shuaibah 1 & 2

Saudi Arabia

2023 - Now

Grid Code Compliance Study, Protection Coordination, And Relay Settings Study

40.5 MWp Selous PV Power Plant

Elsewedy Electric T&D

SCOPE OF WORK

The scope of work was to develop a comprehensive grid code compliance study for a 40.5 MWp Selous PV power plant in Zimbabwe following the Zimbabwe grid code and technical requirements for interconnection new generation with the transmission system. The study included reactive power capabilities, voltage control, short circuits, load flow, power quality, and transient studies. The study has been developed using PSSE and DIgSILENT software packages. ADVEC has also conducted the protection coordination and relay settings study for all protection relays on the medium- and high-voltage networks. The study has been developed using ETAP software

Harare

Zimbabwe

2023 - Now

 

Protection Coordination, And Relay Settings Study

42.0 MWp Yeleen PV Power Plant

Elsewedy Electric T&D

SCOPE OF WORK

The scope of work was to develop the protection coordination and relay settings study for all protection relays on the medium voltageand high voltage network. The study has been developed using ETAP software.

Ouagadougou

Burkina Faso

2023 - Now

Tidal Resources Assessment and Solar Resources Site Assessment

Regional Center for Renewable Energy and Energy Efficiency (RCREE)

SCOPE OF WORK

The scope of work includes the following:

  •  Conducting a comprehensive tidal resource assessment study for a selected location in the Red Sea to assess the feasibility of installing a tidal power plant that utilizes tidal phenomenon to produce electricity.
  • Conducting a solar resource assessment for a site located on the west bank of the Red Sea to assess the feasibility of installing a 100 Wp PV power plant.
  • Developing the concept design of the proposed tidal plant.
  • Developing the concept design of the proposed PV plant.
  • Developing the concept design for the interconnection facility with the transmission network.
  • Developing a comprehensive feasibility study for the project.

Red Sea

Egypt

2023 - 2024

All Projects

  • Technical Assistance to prepare a long-term power system expansion plan for Syrian National Grid

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.
    Date
    November 4, 2024
  • 1.5 MWp PV project in L’oreal

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • 1.4 MWp PV project in Sidi-Kasem Morocco

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • Grid Impact Study

    2.6 GW Shuaibah PV Plant
    CESI
    Scope of work
    Includes Aggregated model using PSCAD, Bench Marking Study for PSCAD model, andControl Interaction Study as part of the electro-magnetic transient compliance requirements.
    Date
    October 28, 2024
  • Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Chad’s Technical Codes.
    Date
    October 28, 2024
  • Grid Impact Study

    Harmonics study for Siemens Niat 500 MW Wind Project.
    Siemens Energy
    Scope of work
    Calculate the grid equivalent at point of common coupling for different harmonic orders to optimally design and size the harmonic filters (harmonics Polygon).
    Date
    October 28, 2024
  • Grid Impact Study

    16 MWp –PV project in Arabia cement
    Solariz
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    October 28, 2024
  • Development Consultations

    15 MWp CHP for NCMP Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    Technical assessment of 1.5 MW combined heat and power (CHP) Technology in DAMFI Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Heidelberg
    Scope of work
    Includes technical review of the project, Statutory approvals and preparing financial feasibility study.
    Date
    October 28, 2024
  • Grid Impact Study

    15 MW – self consumption CHP in IPI factory
    Interstate (IPI)
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Development Consultations

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    October 27, 2024
  • Grid Impact Study

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Power system inertia response under high integration of intermittent resources

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.
    Date
    October 27, 2024
  • Economics of renewable energy under competitive market environment

    National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
    Scope of work
    Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.
    Date
    October 27, 2024
  • Economics of renewable energy under competitive market environment

    National and Renewable Energy Authority
    Scope of work
    Includes Economic dispatch, Unit Commitment, Spot Market, Marginal prices, Zonal Marginal Prices and Impact of integrating intermittent resources on energy and capacity markets.
    Date
    October 27, 2024
  • Power System analysis for integrating RE resources with grid

    Alexandria Distribution Company
    Scope of work
    The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.
    Date
    October 27, 2024
  • Power System analysis for integrating RE resources with grid

    South Delta Distribution Company
    Scope of work
    The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.
    Date
    October 27, 2024
  • Grid Impact Study

    17.5MWp - PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    September 11, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Grid Impact Study

    30 MW – self consumption waste Heat Recovery in Helwan Cement Factory
    Heidelberg
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –PV project in ASCOM
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Technical Assistance to prepare a long-term power system expansion plan for New and Renewable Energy Authority (NREA)

    SOFRECO Consulting
    Scope of work
    Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), Earthing system design, lightening assessment study, preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project in DNM textile factory
    Infinity
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project for JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan.
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp –PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp –PV project for Soma Bay
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp –PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp - PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp –PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp –PV project in COCA COLA (Assuit Factory)
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp –Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp –PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    Grid code compliance and Protection coordination study for 6 MWp PV project in Dina Farms
    IRSC
    Scope of work
    Preparing the protection Coordination and relay settings studies for M.V and L.V network and preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Soma Bay
    Soma Bay
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project in Beity Farm
    Arabian Quadra
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall

    5 MW capacity
    Tawakol Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall

    8 MW capacity
    Intro Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024
  • Support the Technical and Financial Sustainability of EE and RE sectors

    DAI Human Dynamics
    Scope of work
    Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices and performing short-term planning for the power system to validate the reliability and security of the power system.
    Date
    June 24, 2024
  • Assessment and Review of the Feed-In Tariff in Sudan

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.
    Date
    June 24, 2024
  • Promoting the generation of Electricity from Wind Energy

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing a regulatory framework in Sudan to promote the private investments in the field of renewable energy generation, technical and financial assessment of the adopted Feed-in Tariff scheme for the RE projects.
    Date
    June 24, 2024
  • Catalysing the Use of Solar Photovoltaic Energy in Iraq

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing Net-metering financial modelling, Developing the technical requirements for connecting PV power plants to national grid and providing a capacity building program for national staff.
    Date
    June 24, 2024