We think that we are all partners in each single success that we have been achieving since the establishment of ADVEC in 2018

Grid Stability Study

1.45 GWp PV Project

Egyptian Electricity Transmission Company (EETC)

SCOPE OF WORK

The scope of work includes the following:

  •  Optimum design of the interconnection facilities with the HV network.
  • All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
  • HV substation design.

Benban

Aswan - Egypt

2023 - Now

Control Interaction Study

800 MWp and 1800 MWp

Centro Elettrotecnico Sperimentale Italiano (CESI)

SCOPE OF WORK

The scope of work includes the following:

  •  Optimum design of the interconnection facilities with the HV network.
  • All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
  • HV substation design.

Al Shuaibah 1 & 2

Saudi Arabia

2023 - Now

Grid Code Compliance Study, Protection Coordination, And Relay Settings Study

40.5 MWp Selous PV Power Plant

Elsewedy Electric T&D

SCOPE OF WORK

The scope of work was to develop a comprehensive grid code compliance study for a 40.5 MWp Selous PV power plant in Zimbabwe following the Zimbabwe grid code and technical requirements for interconnection new generation with the transmission system. The study included reactive power capabilities, voltage control, short circuits, load flow, power quality, and transient studies. The study has been developed using PSSE and DIgSILENT software packages. ADVEC has also conducted the protection coordination and relay settings study for all protection relays on the medium- and high-voltage networks. The study has been developed using ETAP software

Harare

Zimbabwe

2023 - Now

 

Protection Coordination, And Relay Settings Study

42.0 MWp Yeleen PV Power Plant

Elsewedy Electric T&D

SCOPE OF WORK

The scope of work was to develop the protection coordination and relay settings study for all protection relays on the medium voltageand high voltage network. The study has been developed using ETAP software.

Ouagadougou

Burkina Faso

2023 - Now

Tidal Resources Assessment and Solar Resources Site Assessment

Regional Center for Renewable Energy and Energy Efficiency (RCREE)

SCOPE OF WORK

The scope of work includes the following:

  •  Conducting a comprehensive tidal resources assessment study for a selected location in the Red Sea to assess the feasibility of installing a tidal power plant that utilizes tidal phenomenon to produce rlectricity.
  • Conducting a solar resources assessment for a site located on the west bank of the Red Sea to assess the feasibility of installing a 100 Wp PV power plant.
  • Developing the concept design of the proposed tidal plant.
  • Developing the concept design of the proposed PV plant.
  • Developing the concept design for the interconnection facility with the transmission network.
  • Developing a comprehensive feasibility study for the project.

Red Sea

Egypt

2023 - Now

All Projects

  • Grid Impact Study

    17.5 MWp – Net metering PV project in Dakahlia Poultry
    Karm Solar
    Scope of work
    Full EPC scope for reverse power protection system including the installation, testing and commissioning of Relays, C.B and the control system.
    Date
    September 11, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Development Consultations

    Development consultations scope for 30 MW Waste Heat recovery project in Helwan Cement factory
    Heidelberg
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. EETC Approval
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –Self -Consumption PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –Self-Consumption PV project in ASCOM
    Taqa Arabia
    Scope of work
    • Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Technical Assistance to the New and Renewable Energy Authority (NREA)

    SOFRECO Consulting
    Scope of work
    • Using Antares simulator to propose generation expansion plan for the electricity sector. This includes providing insights and details in:
    1. Scenarios selections.
    2. New technologies.
    3. Demand projections.
    4. Energy modelling using Antares Simulator software.
    • The scope of work also included implementing and intensive capacity building program for the Renewable Energy Authority professionals on usage of Antares model and know-how of building up scenarios and on the economics of Renewable energy.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    August 30, 2024
  • Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    4. Clarence of Disco’s approvals.
    5. Preparing power system studies for the internal network including short-circuit analysis, power quality, transient stability as per petroleum sector requirements and standards.
    6. Design of the earthing system.
    7. Lightning analysis.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project. for DNM textile
    Infinity
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp Net Metering PV - Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp Net Metering PV - Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp Self Consumption PV project - JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal.
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp – Net Metering PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from TAQA Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp – Net Metering PV project for Soma Bay
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp – PPA PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp – Net Metering PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp – Net Metering PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp – Net Metering PV project for COCA COLA Assuit Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Upper Egypt Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp – Net Metering PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS)based on Egyptian Technical Codes and obtain approval from Alexandria Distribution company.
    Date
    June 24, 2024
  • Protection Coordination And Relays Settings In Dina Farms

    6 MWp PV project
    IRSC
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp – Net Metering PV project for Soma Bay
    Soma Bay
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp – Self Consumption PV project for Beity Farm
    Arabian Quadra
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain necessary approvals from The Egyptian Transmission Company.
    Date
    June 24, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall (5 MW capacity)

    Tawakol Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Tawakol Distribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall (8 MW capacity)

    Intro Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Intro istribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Support the Technical and Financial Sustainability of EE and RE sectors

    DAI Human Dynamics
    Scope of work
    • Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices. This includes:
    1. Data collection and data verification.
    2. Building up scenarios for future including projected demands, CO2 emissions, and integration of RE
    3. Recommendations on energy policies.
    4. Training on short term planning (Power system operation) and its impact on the long-term planing.
    5. Integrating new technologies in Egypt e.g., Green Hydrogen, Electric mobility, and water desalination.
    Date
    June 24, 2024
  • Assessment and Review of the Feed-In Tariff in Sudan

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.
    Date
    June 24, 2024
  • Promoting the generation of Electricity from Wind Energy

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    Developing the legal and regulatory framework in Sudan to promote the private investments in the field of renewable energy generation.
    Date
    June 24, 2024
  • Catalysing the Use of Solar Photovoltaic Energy in Iraq

    Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
    Scope of work
    1. Developing Net-metering financial modelling.
    2. Developing the technical requirements for connecting PV power plants to national grid.
    3. Perform Capacity Building Programs for Iraqi staff on the technicalities of integrating PV power plants to national grid.
    Date
    June 24, 2024