Highlighted Projects
Grid Stability Study
1.45 GWp PV Project
Egyptian Electricity Transmission Company (EETC)
SCOPE OF WORK
The scope of work includes the following:
- Optimum design of the interconnection facilities with the HV network.
- All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
- HV substation design.
Control Interaction Study
800 MWp and 1800 MWp
Centro Elettrotecnico Sperimentale Italiano (CESI)
SCOPE OF WORK
The scope of work includes the following:
- Optimum design of the interconnection facilities with the HV network.
- All technical studies including short circuit, power flow, protection coordination, and insulation coordination.
- HV substation design.
Grid Code Compliance Study, Protection Coordination, And Relay Settings Study
40.5 MWp Selous PV Power Plant
Elsewedy Electric T&D
SCOPE OF WORK
The scope of work was to develop a comprehensive grid code compliance study for a 40.5 MWp Selous PV power plant in Zimbabwe following the Zimbabwe grid code and technical requirements for interconnection new generation with the transmission system. The study included reactive power capabilities, voltage control, short circuits, load flow, power quality, and transient studies. The study has been developed using PSSE and DIgSILENT software packages. ADVEC has also conducted the protection coordination and relay settings study for all protection relays on the medium- and high-voltage networks. The study has been developed using ETAP software
Protection Coordination, And Relay Settings Study
42.0 MWp Yeleen PV Power Plant
Elsewedy Electric T&D
SCOPE OF WORK
The scope of work was to develop the protection coordination and relay settings study for all protection relays on the medium voltageand high voltage network. The study has been developed using ETAP software.
Tidal Resources Assessment and Solar Resources Site Assessment
Regional Center for Renewable Energy and Energy Efficiency (RCREE)
SCOPE OF WORK
The scope of work includes the following:
- Conducting a comprehensive tidal resources assessment study for a selected location in the Red Sea to assess the feasibility of installing a tidal power plant that utilizes tidal phenomenon to produce rlectricity.
- Conducting a solar resources assessment for a site located on the west bank of the Red Sea to assess the feasibility of installing a 100 Wp PV power plant.
- Developing the concept design of the proposed tidal plant.
- Developing the concept design of the proposed PV plant.
- Developing the concept design for the interconnection facility with the transmission network.
- Developing a comprehensive feasibility study for the project.
All Projects
Grid Impact Study
17.5 MWp – Net metering PV project in Dakahlia PoultryKarm Solar
Scope of work
Full EPC scope for reverse power protection system including the installation, testing and commissioning of Relays, C.B and the control system.- Date
- September 11, 2024
Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.- Date
- August 31, 2024
Development Consultations
Development consultations scope for 30 MW Waste Heat recovery project in Helwan Cement factoryHeidelberg
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Financial Feasibility Study for the project.
- EETC Approval
- Date
- August 31, 2024
Grid Impact Study
1.2 MWp –Self -Consumption PV project in L’OrealEMPOWER
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
0.8MWp –Self-Consumption PV project in NabqTaqa Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
9 MWp –Self-Consumption PV project in NabqTaqa Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
8 MWp –Self-Consumption PV project in ASCOMTaqa Arabia
Scope of work
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
- Date
- August 31, 2024
Technical Assistance to the New and Renewable Energy Authority (NREA)
SOFRECO Consulting
Scope of work
- Using Antares simulator to propose generation expansion plan for the electricity sector. This includes providing insights and details in:
- Scenarios selections.
- New technologies.
- Demand projections.
- Energy modelling using Antares Simulator software.
- The scope of work also included implementing and intensive capacity building program for the Renewable Energy Authority professionals on usage of Antares model and know-how of building up scenarios and on the economics of Renewable energy.
- Date
- August 31, 2024
Grid Impact Study
0.8 MWp –Self-Consumption PV project in AFCO FactoryAsunim
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 30, 2024
Grid Impact Study
1.9MWp –Self-Consumption PV project in Siemens FactoryAsunim
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.- Date
- August 30, 2024
Grid Impact Study
6 MWp –Self-Consumption PV project in Heidelberg Cement factory in HelwanIntro Utilities
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.- Date
- August 30, 2024
Grid Impact Study
1.5 MWp –Self-Consumption PV project in AOI factory in HelwanArab Organization for Industrialization (AOI)
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.- Date
- August 30, 2024
Interconnection Study
22 GW PV ProjectInfinity
Scope of work
Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.- Date
- June 25, 2024
Development Consultations
12 MW CHP project in IPI factoryInterstate Paper Industries (IPI)
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Financial Feasibility Study for the project.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
1 MWp PV projectAlmatex
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
2.5 MWp PV project for future tourismMantrac
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Petro bel field in Abu RidesENI and Petro Bel Development
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Clarence of Disco’s approvals.
- Preparing power system studies for the internal network including short-circuit analysis, power quality, transient stability as per petroleum sector requirements and standards.
- Design of the earthing system.
- Lightning analysis.
- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Sharm El SheikhIntro Utilities and Gila Tawakol
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
3 MWp PV project. for DNM textileInfinity
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Protection Coordination Studies
17 MWp, 3.99 MWp, and 1.73 MWp PVs Power PlantsIntegrated Renewable and Sustainable Communities (IRSC)
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
1 MWp Net Metering PV - Nissan Automotive FactorySolar Energy System (SES)
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1 MWp Net Metering PV - Robaeya for TextilesRobaeya for Textiles / Fortex
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
7 MWp Self Consumption PV project - JUSHI Fiber Glass FactoryEnara Energy Group
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.- Date
- June 24, 2024
Power System Studies for Micro Grids
5 MW Micro Grid - EngazaatEmpower
Scope of work
- Load Flow Analysis.
- Short circuit Analysis.
- Motor starting Analysis.
- Power Quality Analysis.
- Transient stability Analysis.
- Date
- June 24, 2024
Grid Impact Study
5 MWp – PPA PV project in Sharm El- SheikhIntro Utilities
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal.- Date
- June 24, 2024
Grid Impact Study
1.2 MWp –Self-Consumption PV project in HelwanTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
0.92 MWp – Net Metering PV project for NABQTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from TAQA Distribution company.- Date
- June 24, 2024
Grid Impact Study
3.9 MWp – Net Metering PV project for Soma BayTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
Insulation Coordination System for Ezz Steel Factory
220/30 kV S\SSiemens Energy
Scope of work
Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.- Date
- June 24, 2024
Grid Impact Study
6 MWp – PPA PV project in Sharm El- SheikhHassan Allam
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
MIDOR – MIDELEC Power Generation Expansion Project
Hassan Allam
Scope of work
Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
6MWp - Self Consumption PV project for Dina FarmsIRSC
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1 MWp – Net Metering PV project for Nissan Automotive FactoryNissan Automotive
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1MWp – Net Metering PV project for COCA COLA Nasr City FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1MWp – Net Metering PV project for COCA COLA Tanta FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.- Date
- June 24, 2024
Grid Impact Study
2MWp – Net Metering PV project for COCA COLA Assuit FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Upper Egypt Distribution company.- Date
- June 24, 2024
Grid Impact Study
1MWp – Net Metering PV project for COCA COLA Qaluib FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.- Date
- June 24, 2024
Grid Impact Study
0.75 MWp – Net Metering PV project for COCA COLA Alexandria FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS)based on Egyptian Technical Codes and obtain approval from Alexandria Distribution company.- Date
- June 24, 2024
Protection Coordination And Relays Settings In Dina Farms
6 MWp PV projectIRSC
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
1 MWp – Net Metering PV project for Soma BaySoma Bay
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
Grid Impact Study
17.5MWp – Net Metering PV project for Dakahlia PoultryKarm Solar
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
7 MWp – Self Consumption PV project for Beity FarmArabian Quadra
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain necessary approvals from The Egyptian Transmission Company.- Date
- June 24, 2024
No Name
NCD Swiss
Scope of work
Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Distribution of electricity in O1 Mall (5 MW capacity)
Tawakol Distribution
Scope of work
Clarence of construction permit and Distribution License for Tawakol Distribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Distribution of electricity in walk of Cairo Mall (8 MW capacity)
Intro Distribution
Scope of work
Clarence of construction permit and Distribution License for Intro istribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Support the Technical and Financial Sustainability of EE and RE sectors
DAI Human Dynamics
Scope of work
- Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices. This includes:
- Data collection and data verification.
- Building up scenarios for future including projected demands, CO2 emissions, and integration of RE
- Recommendations on energy policies.
- Training on short term planning (Power system operation) and its impact on the long-term planing.
- Integrating new technologies in Egypt e.g., Green Hydrogen, Electric mobility, and water desalination.
- Date
- June 24, 2024
Assessment and Review of the Feed-In Tariff in Sudan
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.- Date
- June 24, 2024
Promoting the generation of Electricity from Wind Energy
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Developing the legal and regulatory framework in Sudan to promote the private investments in the field of renewable energy generation.- Date
- June 24, 2024
Catalysing the Use of Solar Photovoltaic Energy in Iraq
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
- Developing Net-metering financial modelling.
- Developing the technical requirements for connecting PV power plants to national grid.
- Perform Capacity Building Programs for Iraqi staff on the technicalities of integrating PV power plants to national grid.
- Date
- June 24, 2024