Technical Assistance to prepare a long-term power system expansion plan for Syrian National Grid
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.- Date
- November 4, 2024
1.5 MWp PV project in L’oreal
Empower
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- October 28, 2024
1.4 MWp PV project in Sidi-Kasem Morocco
Empower
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- October 28, 2024
Grid Impact Study
2.6 GW Shuaibah PV PlantCESI
Scope of work
Includes Aggregated model using PSCAD, Bench Marking Study for PSCAD model, andControl Interaction Study as part of the electro-magnetic transient compliance requirements.- Date
- October 28, 2024
Interconnection Study
8 GW – PV Project in Tabuk (Phase II)Assystem
Scope of work
Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- October 28, 2024
Interconnection Study
8 GW – PV Project in Tabuk (Phase II)Assystem
Scope of work
Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- October 28, 2024
Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Protection Coordination Study and relay settings study for the MV and HV relays.- Date
- October 28, 2024
Grid Impact Study
40 MWp PV project in ChadElSewedy (EETD)
Scope of work
Protection Coordination Study and relay settings study for the MV and HV relays.- Date
- October 28, 2024
Grid Impact Study
40 MWp PV project in ChadElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Chad’s Technical Codes.- Date
- October 28, 2024
Grid Impact Study
Harmonics study for Siemens Niat 500 MW Wind Project.Siemens Energy
Scope of work
Calculate the grid equivalent at point of common coupling for different harmonic orders to optimally design and size the harmonic filters (harmonics Polygon).- Date
- October 28, 2024
Grid Impact Study
16 MWp –PV project in Arabia cementSolariz
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- October 28, 2024
Development Consultations
15 MWp CHP for NCMP FactoryIntro Utilities
Scope of work
Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.- Date
- October 28, 2024
Development Consultations
Technical assessment of 1.5 MW combined heat and power (CHP) Technology in DAMFI FactoryIntro Utilities
Scope of work
Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.- Date
- October 28, 2024
Development Consultations
12 MW CHP project in IPI factoryHeidelberg
Scope of work
Includes technical review of the project, Statutory approvals and preparing financial feasibility study.- Date
- October 28, 2024
Grid Impact Study
15 MW – self consumption CHP in IPI factoryInterstate (IPI)
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- October 27, 2024
Development Consultations
2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factoryTCI Sanmar
Scope of work
Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.- Date
- October 27, 2024
Grid Impact Study
2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factoryTCI Sanmar
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- October 27, 2024
Power system inertia response under high integration of intermittent resources
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.- Date
- October 27, 2024
Economics of renewable energy under competitive market environment
National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
Scope of work
Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.- Date
- October 27, 2024
Economics of renewable energy under competitive market environment
National and Renewable Energy Authority
Scope of work
Includes Economic dispatch, Unit Commitment, Spot Market, Marginal prices, Zonal Marginal Prices and Impact of integrating intermittent resources on energy and capacity markets.- Date
- October 27, 2024
Power System analysis for integrating RE resources with grid
Alexandria Distribution Company
Scope of work
The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.- Date
- October 27, 2024
Power System analysis for integrating RE resources with grid
South Delta Distribution Company
Scope of work
The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.- Date
- October 27, 2024
Grid Impact Study
17.5MWp - PV project for Dakahlia PoultryKarm Solar
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- September 11, 2024
Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.- Date
- August 31, 2024
Grid Impact Study
30 MW – self consumption waste Heat Recovery in Helwan Cement FactoryHeidelberg
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- August 31, 2024
Grid Impact Study
1.2 MWp –PV project in L’OrealEMPOWER
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
0.8MWp –PV project in NabqTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
9 MWp –PV project in NabqTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
8 MWp –PV project in ASCOMTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Technical Assistance to prepare a long-term power system expansion plan for New and Renewable Energy Authority (NREA)
SOFRECO Consulting
Scope of work
Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.- Date
- August 31, 2024
Grid Impact Study
0.8 MWp –Self-Consumption PV project in AFCO FactoryAsunim
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
1.9MWp –Self-Consumption PV project in Siemens FactoryAsunim
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
6 MWp –Self-Consumption PV project in Heidelberg Cement factory in HelwanIntro Utilities
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
1.5 MWp –Self-Consumption PV project in AOI factory in HelwanArab Organization for Industrialization (AOI)
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Zizinia El-Mostakbal Compound
ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
Scope of work
1. Design Electrical Networks.
2. Design ELV Networks.- Date
- August 22, 2024
AL FARIDA Hospital, Cairo
FARIDA HOSPITAL
Scope of work
1. Design Electrical system.
2. Design ELV systems.- Date
- August 22, 2024
Shell Operators Building
SHELL EGYPT
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Palestinian Embassy
CUBE CONSUTLANT
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
POLARIS MALL
KVRD
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Landfills Project
Centre of Solid Waste
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Sorting/Transfer Station for Ehnasia-beni-suef
Centre of Solid Waste
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
walk of Cairo Mall
Bonyan for Development and Trade (Bonyan)
Scope of work
1. Design and supervision for Electrical system.
2. Design and supervision for ELV systems.- Date
- August 22, 2024
Belle Vie Club
EMAAR EGYPT
Scope of work
1. Design Electrical Infrastructure Networks.
2. Design ELV Infrastructure Networks.- Date
- August 22, 2024
GE LOCOMOTIVES MAINTENANCE WORKSHOP
Egyptian Railways
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
ALAMEIN LAGOONS
CHINE STATE CONSTRUCTION ENGRG
Scope of work
1. Schematic design for Electrical Networks.
2. Schematic design for ELV Networks.
3. Schematic design for Mechanical Networks.- Date
- August 22, 2024
ALTOUS University
Almotahida Education Group
Scope of work
1. Design Electrical Networks.
2. Design ELV Networks.
3. Design Mechanical Networks.- Date
- August 22, 2024
Fun Land – AQUA Land, JEDDAH, KSA
AQUA Land
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Atlantis hotel, JEDDAH, KSA
ECO ARCH
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA
ECO ARCH
Scope of work
1. Design MEP Infrastructure Networks.- Date
- August 22, 2024
LULU HAFAR AL BATIN, KSA
EMKE
Scope of work
1. Design Electrical system.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
MASAR
UMM AL QURA DEVELOPMENT AND CONSTRUCTION COMPANY
Scope of work
1. Shop drawing for MEP system using BIM Technology.
2. Design Verifications for MEP Systems.- Date
- August 22, 2024
AL DUWADIMI – AFFIF WTS
SALINE WATER CONVERSION CORPARATION
Scope of work
1. Preparing technical and financial study for MEP works.- Date
- August 22, 2024
AIMAGNA and AIBADAA RESEVOIER, NEOM
NEOM ALRAWAF
Scope of work
1. Design Electrical system using BIM Technology.
2. Design PV/BESSs system.
3. Design Infrastructure networks using BIM Technology.
4. Design ELV/ICT system using BIM Technology.- Date
- August 22, 2024
MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA
OSUS REAL ESTATE-SIDEMA
Scope of work
1. Design Electrical systems.
2. Design Infrastructure networks.
3. Design ELV systems.- Date
- August 22, 2024
JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA
Al Quraishi Engineering
Scope of work
1. Design Electrical Infrastructure Networks.
2. Design Irrigation system.
3. Design SCADA system.- Date
- August 22, 2024
grand central terminal caverns
NYC Metropolitan Transportation Authority
Scope of work
1. BIM Collaboration and Modelling for BMS system.- Date
- August 22, 2024
Modera Tampa
Mill Creek Residential Trust
Scope of work
1. BIM Collaboration and coordination with MEP trades.
2. disciplines for proper execution of tender requirements.
3. Develop the solution for the conflict between the various disciplines.- Date
- August 22, 2024
ALSALAAM BANK UGANDA BRANCH
ALSALAAM REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
DEWAN HOUSE
ALBURGE REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
DJIGJIGA TWIN TOWER
ALSALAAM REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
SALLEN APARTMENTS
ALSALAAM REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
SOMALIA Mall
ALBURGE REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
Radisson blu Hotel
ALSALAAM REAL STATE
Scope of work
1. Design Electrical systems.
2. Design ELV systems.
3. Design Plumbing and Firefighting systems.
4. Design HVAC system.- Date
- August 22, 2024
ALSALAAM CITY
ALSALAAM REAL STATE
Scope of work
1. Design Electrical Networks.
2. Design ELV Networks.
3. Design Mechanical Networks.- Date
- August 22, 2024
Livestock Management Solution
IMC
Scope of work
Scope of work includes: 1. Digitalize the whole process of importing cows and tell it selling as fresh or frozen meat. 2. Track cows using digital smart tools. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage veterinary medicines and track comsuptions.- Date
- June 25, 2024
Develop Electricity distribution solutions
Intro Distribution
Scope of work
Scope of work includes: 1. Create a powerful electricity distribution system. 2. Integrate smart meters allowing users to track consumption. 3. and integrate payment gateway for online and offline payment. 4. digitalize implementation and maintenance processes for the technical team. 5. Implement CRM for tracking scheduled and non-scheduled maintenance. 6. Automate document control and issuing bills.- Date
- June 25, 2024
Develop laboratory management solution
Al-Mamlaka Lab
Scope of work
Scope of work includes: 1. Establishing an electronic patient file management system. 2. Managing inventory and consumables for each test and linking all transactions with the accounting system to calculate costs and profits. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage users and implement e-signatures for issuing medical reports.- Date
- June 25, 2024
Develop a Unified Platform that connects all business stakeholders
HighChem
Scope of work
Scope of work includes: 1. Establishing an Online Platform that links stores, sales, purchases, production lines, and inventory before and after manufacturing. 2. Enables customers to submit their order requests. Pricing customers offer using automatically generated AI algorithm.- Date
- June 25, 2024
Create a mobile application for excursion-seeking users
GOOOINGS
Scope of work
Scope of work includes: 1. Implement an intermediate platform between excursion suppliers and excursion seekers. 2. Integrate online International payment gateway. 3. Integrate Google Maps to track excursion paths. 4. Automate suppliers’ workflow and reservations.- Date
- June 25, 2024
Digitalize Internal workflow and generate data analytics
RAKA
Scope of work
Scope of work includes: 1. Transform DCC processes into a digital solution. 2. Control the submittals and drawing revisions. 3. Analyze projects’ status and follow pending and needed action drawings. 4. Transform drawing the list creation and approval process into the same digital solution. 5. Link global branches processes and secure files and data sharing.- Date
- June 25, 2024
Develop CMS Platform and Search Tool for Drug interactions
Pharmed Solutions
Scope of work
Scope of work includes: 1. Create a powerful Drug Information Editing Tool. 2. Develop AI Search algorithm to retrieve Drug Interaction Monographs. 3. Integrate data analytics over both customer usage and pharmacists’ edits.- Date
- June 25, 2024
Interconnection Study
22 GW PV ProjectInfinity
Scope of work
Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.- Date
- June 25, 2024
Development Consultations
12 MW CHP project in IPI factoryInterstate Paper Industries (IPI)
Scope of work
Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.- Date
- June 25, 2024
Development Consultations
1 MWp PV projectAlmatex
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
2.5 MWp PV project for future tourismMantrac
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Petro bel field in Abu RidesENI and Petro Bel Development
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), Earthing system design, lightening assessment study, preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Sharm El SheikhIntro Utilities and Gila Tawakol
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
3 MWp PV project in DNM textile factoryInfinity
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Implementing Of Training Programs
Engineering EconomicsFaculty of Engineering- Ain shams University
Scope of work
- Time Value of money.
- Economic feasibility Vs. Financial feasibility.
- Cash flows.
- Financial statements.
- Financial indicators e.g., IRR, ROE, ROI and NPV.
- Using excel to develop financial feasibility study from scratch.
- Date
- June 25, 2024
Implementing Of Training Programs
Economics Of Renewable EnergyFaculty of Engineering- Ain shams University
Scope of work
- Economic dispatch.
- Unit Commitment.
- Spot Market.
- Marginal prices.
- Zonal Marginal Prices.
- Impact of integrating intermittent resources on energy and capacity markets.
- Date
- June 25, 2024
Power System Inertia Response Under High Integration Of Intermittent Resources
National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
Scope of work
- Stability of the power system.
- Concept of inertia in the power system.
- Impact of low inertia power system on the stability of the system.
- Virtual inertia.
- Date
- June 25, 2024
Economics Of Renewable Energy Under Competitive Market Environment
National and Renewable Energy Authority
Scope of work
- Economic dispatch.
- Unit Commitment.
- Spot Market.
- Marginal prices.
- Zonal Marginal Prices.
- Impact of integrating intermittent resources on energy and capacity markets.
- Date
- June 25, 2024
Power System Aspects Of Integrating PV Projects To The National Grid
Alexandria Distribution Company
Scope of work
- Dynamic user defined models of PV inverters.
- Transient and Dynamic response of the PV power plants.
- Power quality aspects of the PV power Plants.
- P-Q capability Curve of the inverters.
- Date
- June 25, 2024
Power System Aspects Of Integrating PV Projects To The National Grid
South Delta Distribution Company
Scope of work
- Dynamic user defined models of PV inverters.
- Transient and Dynamic response of the PV power plants.
- Power quality aspects of the PV power Plants.
- P-Q capability Curve of the inverters.
- Date
- June 25, 2024
Protection Coordination Studies
17 MWp, 3.99 MWp, and 1.73 MWp PVs Power PlantsIntegrated Renewable and Sustainable Communities (IRSC)
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
1 MWp –PV project for Nissan Automotive FactorySolar Energy System (SES)
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.1 MWp –PV project for Robaeya for TextilesRobaeya for Textiles / Fortex
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
7 MWp –PV project for JUSHI Fiber Glass FactoryEnara Energy Group
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Power System Studies for Micro Grids
5 MW Micro Grid - EngazaatEmpower
Scope of work
- Load Flow Analysis.
- Short circuit Analysis.
- Motor starting Analysis.
- Power Quality Analysis.
- Transient stability Analysis.
- Date
- June 24, 2024
Grid Impact Study
5 MWp – PPA PV project in Sharm El- SheikhIntro Utilities
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.2 MWp –Self-Consumption PV project in Helwan.TAQA Arabia
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
0.92 MWp –PV project for NABQTAQA Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
3.9 MWp –PV project for Soma BayTAQA Arabia
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Insulation Coordination System for Ezz Steel Factory
220/30 kV S\SSiemens Energy
Scope of work
Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.- Date
- June 24, 2024
Grid Impact Study
6 MWp –PV project in Sharm El- SheikhHassan Allam
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
MIDOR – MIDELEC Power Generation Expansion Project
Hassan Allam
Scope of work
Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
6MWp - Self Consumption PV project for Dina FarmsIRSC
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1 MWp –PV project for Nissan Automotive FactoryNissan Automotive
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1MWp - PV project for COCA COLA Nasr City FactorySolariz Egypt
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.1MWp –PV project for COCA COLA Tanta FactorySolariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
2MWp –PV project in COCA COLA (Assuit Factory)Solariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1MWp –Metering PV project for COCA COLA Qaluib FactorySolariz Egypt
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
0.75 MWp –PV project for COCA COLA Alexandria FactorySolariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
Grid code compliance and Protection coordination study for 6 MWp PV project in Dina FarmsIRSC
Scope of work
Preparing the protection Coordination and relay settings studies for M.V and L.V network and preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1 MWp –PV project for Soma BaySoma Bay
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
17.5MWp – Net Metering PV project for Dakahlia PoultryKarm Solar
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- June 24, 2024
Grid Impact Study
7 MWp –PV project in Beity FarmArabian Quadra
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
No Name
NCD Swiss
Scope of work
Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Distribution of electricity in O1 Mall
5 MW capacityTawakol Distribution
Scope of work
providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.- Date
- June 24, 2024
Distribution of electricity in walk of Cairo Mall
8 MW capacityIntro Distribution
Scope of work
providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.- Date
- June 24, 2024
Support the Technical and Financial Sustainability of EE and RE sectors
DAI Human Dynamics
Scope of work
Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices and performing short-term planning for the power system to validate the reliability and security of the power system.- Date
- June 24, 2024
Assessment and Review of the Feed-In Tariff in Sudan
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.- Date
- June 24, 2024
Promoting the generation of Electricity from Wind Energy
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Developing a regulatory framework in Sudan to promote the private investments in the field of renewable energy generation, technical and financial assessment of the adopted Feed-in Tariff scheme for the RE projects.- Date
- June 24, 2024
Catalysing the Use of Solar Photovoltaic Energy in Iraq
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Developing Net-metering financial modelling, Developing the technical requirements for connecting PV power plants to national grid and providing a capacity building program for national staff.- Date
- June 24, 2024