1.4 MWp –PV project in Coca Cola Heliopolis
TED Solar
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution Company.- Date
- April 14, 2025
8 MWp – Net metering PV project in El-Gouna
Solariz
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- April 14, 2025
500 MWp+ BESS –PV project (Obliesk)
SACTEC
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis and electro-magnetic transient studies) and obtain the approval from EETC.- Date
- April 14, 2025
3 MWp PV project in Cairo
ABB
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- April 14, 2025
3 MWp –PV project in Sumitomo Electric
IRSC
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution company.- Date
- April 14, 2025
17.5 MWp –PV project in Banisuif Cement Factory
IRSC
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution company.- Date
- April 14, 2025
2.6 GW Shuaibah PV Plant (phase 2)
CESI
Scope of work
Aggregated model using PSCAD, Bench Marking Study for PSCAD model, and Control Interaction Study as part of the electro-magnetic transient compliance requirements.- Date
- April 14, 2025
Energy Modelling for TBC Wave 2 School in MADINAH
BEC|MOBCO
Scope of work
Conduct comprehensive energy simulations using HAP software to assess system performance. Additionally, calculate annual water consumption based on the Full-Time Equivalent (FTE) method. and obtain the approval from the Ministry of Education, Saudi Arabia.- Date
- April 14, 2025
1.4 MWp PV project Saray Immo
Empower New Energy
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- April 14, 2025
1.00 MWp PV project Tanakoo
Empower New Energy
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- April 14, 2025
Grid Impact Study
40 MWp PV project in ChadElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Chad’s Technical Codes.- Date
- October 28, 2024
Grid Impact Study
40 MWp PV project in ChadElSewedy (EETD)
Scope of work
Protection Coordination Study and relay settings study for the MV and HV relays.- Date
- October 28, 2024
Interconnection Study
8 GW – PV Project in Tabuk (Phase II)Assystem
Scope of work
Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- October 28, 2024
1.5 MWp PV project in L’oreal
Empower
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- October 28, 2024
2.5 MWp –PV project in El Oriental Weaver
IRSC
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from EETC.- Date
- April 14, 2025
2.5 MW PV micro-grid in Ghana
Empower New Energy
Scope of work
Power system transient stability, electro-magnetic transient stability, protection coordination, relays settings and owner engineer.- Date
- April 14, 2025
Interconnection Study
22 GW PV ProjectAsunim
Scope of work
The optimal design of HV interconnection facilities includes all technical studies such as short circuit, power flow, protection coordination, and insulation coordination, along with HV substation design.- Date
- June 25, 2024
Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Protection Coordination Study and relay settings study for the MV and HV relays.- Date
- October 28, 2024
Interconnection Study
8 GW – PV Project in Tabuk (Phase II)Assystem
Scope of work
Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- October 28, 2024
Grid Impact Study
2.6 GW Shuaibah PV PlantCESI
Scope of work
Aggregated model using PSCAD, Bench Marking Study for PSCAD model, andControl Interaction Study as part of the electro-magnetic transient compliance requirements.- Date
- October 28, 2024
1.4 MWp PV project in Sidi-Kasem Morocco
Empower
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- October 28, 2024
Development Consultations
3 MWp PV project in DNM textile factoryInfinity
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Sharm El SheikhIntro Utilities and Gila Tawakol
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Petro bel field in Abu RidesENI and Petro Bel Development
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), Earthing system design, lightening assessment study, preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
2.5 MWp PV project for future tourismMantrac
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
1 MWp PV projectAlmatex
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.- Date
- June 25, 2024
Development Consultations
12 MW CHP project in IPI factoryInterstate Paper Industries (IPI)
Scope of work
Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.- Date
- June 25, 2024
Development Consultations
2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factoryTCI Sanmar
Scope of work
Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.- Date
- October 27, 2024
Development Consultations
12 MW CHP project in IPI factoryHeidelberg
Scope of work
Includes technical review of the project, Statutory approvals and preparing financial feasibility study.- Date
- October 28, 2024
Development Consultations
Technical assessment of 1.5 MW combined heat and power (CHP) Technology in DAMFI FactoryIntro Utilities
Scope of work
Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.- Date
- October 28, 2024
Development Consultations
15 MWp CHP for NCMP FactoryIntro Utilities
Scope of work
Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.- Date
- October 28, 2024
1.8 MWp –PV project in Makadi Bay
Solariz
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution Company.- Date
- April 14, 2025
5 MWp –PV project in ERC
Solariz
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution company.- Date
- April 14, 2025
2.5 MWp –PV project in Soma Bay
Taqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution Company.- Date
- April 14, 2025
1.2 MWp PV project in Tunisia
Empwer New Energy
Scope of work
Full detailed design engineering package including DC system, AC system, Interconnection Facilities and all relevant studies.- Date
- April 14, 2025
1.5 MWp PV project in L’oreal
Empower New Energy
Scope of work
Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.- Date
- April 15, 2025
Support the Technical and Financial Sustainability of EE and RE sectors
DAI Human Dynamics
Scope of work
Contributing to the update of the energy strategy in Egypt considering new technologies, adopted policies and new prices and performing short-term planning for the power system to validate the reliability and security of the power system.- Date
- June 24, 2024
Technical Assistance to prepare a long-term power system expansion plan for New and Renewable Energy Authority (NREA)
SOFRECO Consulting
Scope of work
Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.- Date
- August 31, 2024
Power System analysis for integrating RE resources with grid
South Delta Distribution Company
Scope of work
The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.- Date
- October 27, 2024
Power System analysis for integrating RE resources with grid
Alexandria Distribution Company
Scope of work
The training addressed the different types of studies required to ensure compliance with technical requirements including load flow analysis, short circuit analysis, Power quality and harmonics analysis, transient analysis electro-magnetic transient.- Date
- October 27, 2024
Economics of renewable energy under competitive market environment
National and Renewable Energy Authority
Scope of work
Includes Economic dispatch, Unit Commitment, Spot Market, Marginal prices, Zonal Marginal Prices and Impact of integrating intermittent resources on energy and capacity markets.- Date
- October 27, 2024
Economics of renewable energy under competitive market environment
National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
Scope of work
Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.- Date
- October 27, 2024
Power system inertia response under high integration of intermittent resources
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Includes Stability of the power system, Concept of inertia in the power system, Impact of low inertia power system on the stability of the system and Virtual inertia.- Date
- October 27, 2024
Technical Assistance to prepare a long-term power system expansion plan for Syrian National Grid
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Using ANTARES simulator (software package that has been developed by RTE France) developing a long-term power system planning to optimally allocate future generation resources to meet the demand given different system constraints.- Date
- November 4, 2024
6 GW – PV Project in Tabuk (Phase III)
Assystem
Scope of work
Optimum design of the interconnection facilities with HV network, all technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- April 15, 2025
8 MWp –PV project in El Gouna
Solariz
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from EETC.- Date
- April 15, 2025
2.5 MWp PV project in Abu Qir Fertilizers
Abu Qir Fertilizers
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Egypt’s Technical Codes and obtain the approval by the Egyptian Electricity Transmission Company.- Date
- April 15, 2025
1.4 MWp –PV project in Coca Cola Nasr City
The Solar Company
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis) and obtain the approval from Distribution Company.- Date
- April 15, 2025
2.6 GW Shuaibah PV Plant (phase 1)
CESI
Scope of work
Aggregated model using PSCAD, Bench Marking Study for PSCAD model, and Control Interaction Study as part of the electro-magnetic transient compliance requirements.- Date
- April 15, 2025
86 MWp PV plant on west coast of the Red Sea
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Solar Resources assessment, concept design of the PV plant and Feasibility Study and substation concept design for interconnection with the Grid- Date
- April 15, 2025
Resources assessment of Tidal potential in the west coast of the Red Sea
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Tidal resources assessment, mathematical modelling of tidal and wave potentials in the Red Sea, concept design of the undersea tidal turbines’ farms, Feasibility Study and substation concept design for interconnection with the Grid.- Date
- April 15, 2025
8 GW – PV Project in Tabuk (Phase II)
Assystem
Scope of work
Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.- Date
- April 15, 2025
Sindalah Power Plant S
ELAF Saudi
Scope of work
The project scope includes relay coordination for the Sindalah Power Plant, a harmonics analysis study for the MDB, and shop drawing submittals covering electrical works, telecom & ICT works, fire fighting works, HVAC works, plumbing works, fuel system, and mechanical I&C works.- Date
- April 15, 2025
Grid impact analysis of the Benban project (1645 MWp) PV on the Egyptian national grid
Egyptian Electricity Transmission Company (EETC)
Scope of work
Grid impact assessment on the grid considering frequency stability and voltage stability. Proposing the best mode of operation for the PV plants in Benban to ensure stability of the grid and optimizing the power system operational cost.- Date
- April 15, 2025
Grid Impact Study
7 MWp –PV project in Beity FarmArabian Quadra
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
17.5MWp – Net Metering PV project for Dakahlia PoultryKarm Solar
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- June 24, 2024
Grid Impact Study
1 MWp –PV project for Soma BaySoma Bay
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
Grid code compliance and Protection coordination study for 6 MWp PV project in Dina FarmsIRSC
Scope of work
Preparing the protection Coordination and relay settings studies for M.V and L.V network and preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
0.75 MWp –PV project for COCA COLA Alexandria FactorySolariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1MWp –Metering PV project for COCA COLA Qaluib FactorySolariz Egypt
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
2MWp –PV project in COCA COLA (Assuit Factory)Solariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.1MWp –PV project for COCA COLA Tanta FactorySolariz Egypt
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1MWp - PV project for COCA COLA Nasr City FactorySolariz Egypt
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.1 MWp –PV project for Nissan Automotive FactoryNissan Automotive
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
6 MWp –PV project in Sharm El- SheikhHassan Allam
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
3.9 MWp –PV project for Soma BayTAQA Arabia
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
0.92 MWp –PV project for NABQTAQA Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.2 MWp –Self-Consumption PV project in Helwan.TAQA Arabia
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
5 MWp – PPA PV project in Sharm El- SheikhIntro Utilities
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
7 MWp –PV project for JUSHI Fiber Glass FactoryEnara Energy Group
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.1 MWp –PV project for Robaeya for TextilesRobaeya for Textiles / Fortex
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1 MWp –PV project for Nissan Automotive FactorySolar Energy System (SES)
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- June 24, 2024
Grid Impact Study
1.5 MWp –Self-Consumption PV project in AOI factory in HelwanArab Organization for Industrialization (AOI)
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
6 MWp –Self-Consumption PV project in Heidelberg Cement factory in HelwanIntro Utilities
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
1.9MWp –Self-Consumption PV project in Siemens FactoryAsunim
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
0.8 MWp –Self-Consumption PV project in AFCO FactoryAsunim
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 30, 2024
Grid Impact Study
8 MWp –PV project in ASCOMTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
9 MWp –PV project in NabqTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
0.8MWp –PV project in NabqTaqa Arabia
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
1.2 MWp –PV project in L’OrealEMPOWER
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- August 31, 2024
Grid Impact Study
30 MW – self consumption waste Heat Recovery in Helwan Cement FactoryHeidelberg
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- August 31, 2024
Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.- Date
- August 31, 2024
Grid Impact Study
17.5MWp - PV project for Dakahlia PoultryKarm Solar
Scope of work
preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- September 11, 2024
Grid Impact Study
2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factoryTCI Sanmar
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- October 27, 2024
Grid Impact Study
15 MW – self consumption CHP in IPI factoryInterstate (IPI)
Scope of work
Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.- Date
- October 27, 2024
Grid Impact Study
16 MWp –PV project in Arabia cementSolariz
Scope of work
Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).- Date
- October 28, 2024
Grid Impact Study
Harmonics study for Siemens Niat 500 MW Wind Project.Siemens Energy
Scope of work
Calculate the grid equivalent at point of common coupling for different harmonic orders to optimally design and size the harmonic filters (harmonics Polygon).- Date
- October 28, 2024
Catalysing the Use of Solar Photovoltaic Energy in Iraq
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Developing Net-metering financial modelling, Developing the technical requirements for connecting PV power plants to national grid and providing a capacity building program for national staff.- Date
- June 24, 2024
Promoting the generation of Electricity from Wind Energy
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Developing a regulatory framework in Sudan to promote the private investments in the field of renewable energy generation, technical and financial assessment of the adopted Feed-in Tariff scheme for the RE projects.- Date
- June 24, 2024
Assessment and Review of the Feed-In Tariff in Sudan
Regional Centre for Renewable Energy and Energy Efficiency (RCREEE)
Scope of work
Review and analyse the feed-in tariff rates in Sudan for renewable energy technologies considering market updates and include recommendation and roadmap for future implementation.- Date
- June 24, 2024
Distribution of electricity in walk of Cairo Mall
8 MW capacityIntro Distribution
Scope of work
providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.- Date
- June 24, 2024
Distribution of electricity in O1 Mall
5 MW capacityTawakol Distribution
Scope of work
providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.- Date
- June 24, 2024
Grid Impact Study
6MWp - Self Consumption PV project for Dina FarmsIRSC
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
MIDOR – MIDELEC Power Generation Expansion Project
Hassan Allam
Scope of work
Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Insulation Coordination System for Ezz Steel Factory
220/30 kV S\SSiemens Energy
Scope of work
Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.- Date
- June 24, 2024
Power System Studies for Micro Grids
5 MW Micro Grid - EngazaatEmpower
Scope of work
The required power system analyses include load flow analysis, short circuit analysis, motor starting analysis, power quality analysis, and transient stability analysis.- Date
- June 24, 2024
Protection Coordination Studies
17 MWp, 3.99 MWp, and 1.73 MWp PVs Power PlantsIntegrated Renewable and Sustainable Communities (IRSC)
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Power System Aspects Of Integrating PV Projects To The National Grid
South Delta Distribution Company
Scope of work
The analysis encompasses dynamic user-defined models of PV inverters, investigates the transient and dynamic response of PV power plants, evaluates power quality aspects of PV installations, and examines the P-Q capability curves of grid-connected inverters to assess their operational performance and grid support functionalities.- Date
- June 25, 2024
Power System Aspects Of Integrating PV Projects To The National Grid
Alexandria Distribution Company
Scope of work
The analysis encompasses dynamic user-defined models of PV inverters, investigates the transient and dynamic response of PV power plants, evaluates power quality aspects of PV installations, and examines the P-Q capability curves of grid-connected inverters to assess their operational performance and grid support functionalities.- Date
- June 25, 2024
Economics Of Renewable Energy Under Competitive Market Environment
National and Renewable Energy Authority
Scope of work
Economic dispatch and unit commitment optimize power generation in spot markets, where marginal prices (like zonal marginal prices) are set, while integrating intermittent resources impacts both energy and capacity markets by introducing variability and changing price dynamics.- Date
- June 25, 2024
Power System Inertia Response Under High Integration Of Intermittent Resources
National and Renewable Energy Authority and The Egyptian Electricity Regulatory Agency
Scope of work
The study examines power system stability, the fundamental concept of inertia in power systems, the critical impact of low-inertia conditions on system stability, and the emerging solutions like virtual inertia to mitigate these challenges.- Date
- June 25, 2024
Implementing Of Training Programs
Economics Of Renewable EnergyFaculty of Engineering- Ain shams University
Scope of work
The analysis covers economic dispatch, unit commitment, spot market operations, marginal pricing mechanisms (including zonal marginal prices), and the impact of integrating intermittent renewable resources on both energy and capacity markets.- Date
- June 25, 2024
Implementing Of Training Programs
Engineering EconomicsFaculty of Engineering- Ain shams University
Scope of work
The study covers the time value of money, economic feasibility versus financial feasibility, cash flows, financial statements, key financial indicators (such as IRR, ROE, ROI, and NPV), and using Excel to develop a financial feasibility study from scratch.- Date
- June 25, 2024
Develop Electricity distribution solutions
Intro Distribution
Scope of work
Scope of work includes: 1. Create a powerful electricity distribution system. 2. Integrate smart meters allowing users to track consumption. 3. and integrate payment gateway for online and offline payment. 4. digitalize implementation and maintenance processes for the technical team. 5. Implement CRM for tracking scheduled and non-scheduled maintenance. 6. Automate document control and issuing bills.- Date
- June 25, 2024
Livestock Management Solution
IMC
Scope of work
Scope of work includes: 1. Digitalize the whole process of importing cows and tell it selling as fresh or frozen meat. 2. Track cows using digital smart tools. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage veterinary medicines and track comsuptions.- Date
- June 25, 2024
ENERGY MODELLING OFOR SIXTY SCHOOLS IN MADINAH
Ministry Of Education
Scope of work
Energy Simulation, including costs, tariffs, and feasibility of the designated system using HAP E20-Software and Calculation of annual water consumption based on the FTE Method.- Date
- February 26, 2025
Wadi Al Safa Villas
Residential compound consisted of four types for villas and club houseDivision Engineering Consultants
Scope of work
Shop drawing for MEP system using BIM Technology with LOD 500.- Date
- February 26, 2025
Exclusive partnership with ACO for Aftersales Support for SUNGROW Inverters
SUNGROW Inverter Owners
Scope of work
ADVEC is proud to collaborate with ACO to provide comprehensive after-sales and troubleshooting services for SUNGROW inverters. This partnership ensures prompt technical support, on-site diagnostics, and efficient resolution of inverter-related issues, enhancing system reliability and customer satisfaction.- Date
- April 15, 2025
No Name
NCD Swiss
Scope of work
Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Develop CMS Platform and Search Tool for Drug interactions
Pharmed Solutions
Scope of work
Scope of work includes: 1. Create a powerful Drug Information Editing Tool. 2. Develop AI Search algorithm to retrieve Drug Interaction Monographs. 3. Integrate data analytics over both customer usage and pharmacists’ edits.- Date
- June 25, 2024
Digitalize Internal workflow and generate data analytics
RAKA
Scope of work
Scope of work includes: 1. Transform DCC processes into a digital solution. 2. Control the submittals and drawing revisions. 3. Analyze projects’ status and follow pending and needed action drawings. 4. Transform drawing the list creation and approval process into the same digital solution. 5. Link global branches processes and secure files and data sharing.- Date
- June 25, 2024
Create a mobile application for excursion-seeking users
GOOOINGS
Scope of work
Scope of work includes: 1. Implement an intermediate platform between excursion suppliers and excursion seekers. 2. Integrate online International payment gateway. 3. Integrate Google Maps to track excursion paths. 4. Automate suppliers’ workflow and reservations.- Date
- June 25, 2024
Develop a Unified Platform that connects all business stakeholders
HighChem
Scope of work
Scope of work includes: 1. Establishing an Online Platform that links stores, sales, purchases, production lines, and inventory before and after manufacturing. 2. Enables customers to submit their order requests. Pricing customers offer using automatically generated AI algorithm.- Date
- June 25, 2024
Develop laboratory management solution
Al-Mamlaka Lab
Scope of work
Scope of work includes: 1. Establishing an electronic patient file management system. 2. Managing inventory and consumables for each test and linking all transactions with the accounting system to calculate costs and profits. 3. Analyze data and generate powerful tools to facilitate the decision-making process. 4. Manage users and implement e-signatures for issuing medical reports.- Date
- June 25, 2024
Radisson blu Hotel
ALSALAAM REAL STATE
Scope of work
Design MEP systems.- Date
- August 22, 2024
SOMALIA Mall
ALBURGE REAL STATE
Scope of work
Design and Coordination for MEP systems using BIM Technology with LOD 350.- Date
- August 22, 2024
SALLEN APARTMENTS
ALSALAAM REAL STATE
Scope of work
Design MEP systems.- Date
- August 22, 2024
DJIGJIGA TWIN TOWER
ALSALAAM REAL STATE
Scope of work
Design MEP systems.- Date
- August 22, 2024
DEWAN HOUSE
ALBURGE REAL STATE
Scope of work
Design MEP systems.- Date
- August 22, 2024
ALSALAAM BANK UGANDA BRANCH
ALSALAAM REAL STATE
Scope of work
Design MEP systems.- Date
- August 22, 2024
Modera Tampa
Modera Tampa is a mixed-use development located in the River Arts District of Tampa, Florida. The project site occupies approximately 2.2 acresMill Creek Residential Trust
Scope of work
Modelling LOD 400 and Coordination for MEP systems using BIM Technology.- Date
- August 22, 2024
Grand Central Terminal Caverns
NYC Metropolitan Transportation Authority
Scope of work
BIM Collaboration and Modelling for BMS system LOD 500.- Date
- August 22, 2024
JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA
Al Quraishi Engineering
Scope of work
Design Electrical Infrastructure Networks, Irrigation system. SCADA system.- Date
- August 22, 2024
MARSIA RESIDENTIAL-COMMERICAL COMPOUND KSA
OSUS REAL ESTATE-SIDEMA
Scope of work
Design Infrastructure networks and MEP inside building.- Date
- August 22, 2024
AL DUWADIMI – AFFIF WTS
SALINE WATER CONVERSION CORPARATION
Scope of work
Preparing technical and financial study for MEP works and infrastructure.- Date
- August 22, 2024
LULU HAFAR AL BATIN, KSA
EMKE
Scope of work
Design MEP systems.- Date
- August 22, 2024
Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA
ECO ARCH
Scope of work
Design MEP Infrastructure Networks.- Date
- August 22, 2024
Atlantis hotel, JEDDAH, KSA
This project is located in Jeddah, consisting of main hotel project rear villas and wedding hall. The main hotel tower consists of 3 underground parking floors ,6 mixed use floors,12 administrative floors and 10 residential floorsECO ARCH
Scope of work
Design MEP Systems.- Date
- August 22, 2024
Fun Land – AQUA Land, JEDDAH, KSA
AQUA Land
Scope of work
Design MEP systems.- Date
- August 22, 2024
ALTOUS University
Almotahida Education Group
Scope of work
Design Infrastructure systems.- Date
- August 22, 2024
ALAMEIN LAGOONS
CHINE STATE CONSTRUCTION ENGRG
Scope of work
Schematic design for Electrical, ELV and Mechanical systems.- Date
- August 22, 2024
GE LOCOMOTIVES MAINTENANCE WORKSHOP
Egyptian Railways
Scope of work
Design MEP systems.- Date
- August 22, 2024
Belle Vie Club
EMAAR EGYPT
Scope of work
Design Infrastructure Networks.- Date
- August 22, 2024
Renovation Of Walk Of Cairo Mall
Bonyan for Development and Trade (Bonyan)
Scope of work
Design and supervision for Electrical and ELV system.- Date
- August 22, 2024
Sorting/Transfer Station for Ehnasia-beni-suef
Centre of Solid Waste
Scope of work
Design MEP systems.- Date
- August 22, 2024
Landfills Project
Centre of Solid Waste
Scope of work
Design MEP systems.- Date
- August 22, 2024
POLARIS MALL
KVRD
Scope of work
Design MEP system.- Date
- August 22, 2024
Palestinian Embassy
CUBE CONSUTLANT
Scope of work
Design MEP systems.- Date
- August 22, 2024
Shell Operators Building
SHELL EGYPT
Scope of work
Design MEP systems.- Date
- August 22, 2024
AL FARIDA Hospital, Cairo
FARIDA HOSPITAL
Scope of work
Design MEP systems.- Date
- August 22, 2024
Zizinia El-Mostakbal Compound
ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
Scope of work
Design Electrical and ELV Infrastructure.- Date
- August 22, 2024
MAG TOWER
MAG TOWER PLOT AREA 4500 M2 CONSISTE OF GROUND +5 PODIUMS+HC/TECH. FLOOR+23 TYPICAL FLOOR + ROOFMAG
Scope of work
Modelling LOD 400 and Coordination for MEP systems.- Date
- February 26, 2025
MASAR MALL
MASAR MALL PROJECT WITH PLOT AREA 6000 M2 CONSISTE OF BASEMENT, STREET LEVEL, MEZZANINE BOULEVARD+ 1ST FLOOR + SECOND FLOOR LOWER ROOF + UPPDER ROOF +5 PODIUMS+HC/TECH. FLOOR+23 TYPICAL FLOOR + ROOFMASAR
Scope of work
Modelling LOD 400 and Coordination for MEP systems and shop drawing.- Date
- February 26, 2025
JEDDAH ISLAMIC PORT INTERNATIONAL
Extension of Jeddah Islamic Port (107,000 m²) with Additional Contactor Cooling and Refrigerated Container FacilitiesCMA CGM
Scope of work
Design Infrastructure networks and building MEP systems.- Date
- February 26, 2025
EXECUTION OF PARALLEL RUNWAY (PRW) KING SALMAN AIR BASE (CENTRAL SECTOR)
Kabbani Construction Group Special Projects Division
Scope of work
Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.- Date
- February 26, 2025
AIMAGNA and AIBADAA RESEVOIER, NEOM
NEOM ALRAWAF
Scope of work
Design MEP systems using BIM Technology with LOD 350.- Date
- February 26, 2025
Configuration of new MV protection relay settings and tesing at El Qatamya Cement plant
Heidelberg
Scope of work
Protection relay configuration for new relays includes the setup of multiple protection functions such as Overcurrent Protection, Earth Fault Protection, Broken Conductor Protection, Transformer Overload Protection, Transformer Inrush Inhibit, Reverse Power Protection, and Medium Voltage (MV) Motor Differential Protection, along with performing protection relay secondary injection testing to ensure accurate operation and reliability.- Date
- April 15, 2025
Earth fault accompanied by inverter failure at Bariq Factory
Bariq Factory
Scope of work
A Root Cause Analysis (RCA) was conducted due to an earth fault accompanied by an inverter failure at the Bariq Factory. The scope of work included a site survey and data collection, followed by conducting power quality analysis under different operational scenarios of the factory’s network to identify the damaged component.- Date
- April 15, 2025
Medium Voltage Switchgear Fire Accident
TUV Austria
Scope of work
A RCA was conducted due to five significant accidents at a MV switchgear (MVSG) in 500/220/66/11kV GIS Substation. These incidents have endangered station workers, equipment, and facilities. The scope included a site survey and data collection, bay to bay contact resistance testing and detailed short circuit studies are simulated using ETAP software to analysis the failure root cause.- Date
- April 15, 2025