Earth fault accompanied by inverter failure at Bariq Factory
Bariq Factory
Scope of work
A Root Cause Analysis (RCA) was conducted due to an earth fault accompanied by an inverter failure at the Bariq Factory. The scope of work included a site survey and data collection, followed by conducting power quality analysis under different operational scenarios of the factory’s network to identify the damaged component.- Date
- April 15, 2025
Medium Voltage Switchgear Fire Accident
TUV Austria
Scope of work
A RCA was conducted due to five significant accidents at a MV switchgear (MVSG) in 500/220/66/11kV GIS Substation. These incidents have endangered station workers, equipment, and facilities. The scope included a site survey and data collection, bay to bay contact resistance testing and detailed short circuit studies are simulated using ETAP software to analysis the failure root cause.- Date
- April 15, 2025