• Earth fault accompanied by inverter failure at Bariq Factory

    Bariq Factory
    Scope of work
    A Root Cause Analysis (RCA) was conducted due to an earth fault accompanied by an inverter failure at the Bariq Factory. The scope of work included a site survey and data collection, followed by conducting power quality analysis under different operational scenarios of the factory’s network to identify the damaged component.
    Date
    April 15, 2025
  • Medium Voltage Switchgear Fire Accident

    TUV Austria
    Scope of work
    A RCA was conducted due to five significant accidents at a MV switchgear (MVSG) in 500/220/66/11kV GIS Substation. These incidents have endangered station workers, equipment, and facilities. The scope included a site survey and data collection, bay to bay contact resistance testing and detailed short circuit studies are simulated using ETAP software to analysis the failure root cause.
    Date
    April 15, 2025