Grid Impact Study
35.5 PV project in ZimbabweElSewedy (EETD)
Scope of work
Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.- Date
- August 31, 2024
Grid Impact Study
1.2 MWp –Self -Consumption PV project in L’OrealEMPOWER
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
0.8MWp –Self-Consumption PV project in NabqTaqa Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
9 MWp –Self-Consumption PV project in NabqTaqa Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 31, 2024
Grid Impact Study
8 MWp –Self-Consumption PV project in ASCOMTaqa Arabia
Scope of work
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
- Date
- August 31, 2024
Grid Impact Study
0.8 MWp –Self-Consumption PV project in AFCO FactoryAsunim
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.- Date
- August 30, 2024
Grid Impact Study
1.9MWp –Self-Consumption PV project in Siemens FactoryAsunim
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.- Date
- August 30, 2024
Grid Impact Study
6 MWp –Self-Consumption PV project in Heidelberg Cement factory in HelwanIntro Utilities
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.- Date
- August 30, 2024
Grid Impact Study
1.5 MWp –Self-Consumption PV project in AOI factory in HelwanArab Organization for Industrialization (AOI)
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.- Date
- August 30, 2024
Protection Coordination Studies
17 MWp, 3.99 MWp, and 1.73 MWp PVs Power PlantsIntegrated Renewable and Sustainable Communities (IRSC)
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
1 MWp Net Metering PV - Nissan Automotive FactorySolar Energy System (SES)
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1 MWp Net Metering PV - Robaeya for TextilesRobaeya for Textiles / Fortex
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
7 MWp Self Consumption PV project - JUSHI Fiber Glass FactoryEnara Energy Group
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.- Date
- June 24, 2024
Power System Studies for Micro Grids
5 MW Micro Grid - EngazaatEmpower
Scope of work
- Load Flow Analysis.
- Short circuit Analysis.
- Motor starting Analysis.
- Power Quality Analysis.
- Transient stability Analysis.
- Date
- June 24, 2024
Grid Impact Study
5 MWp – PPA PV project in Sharm El- SheikhIntro Utilities
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal.- Date
- June 24, 2024
Grid Impact Study
1.2 MWp –Self-Consumption PV project in HelwanTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
0.92 MWp – Net Metering PV project for NABQTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from TAQA Distribution company.- Date
- June 24, 2024
Grid Impact Study
3.9 MWp – Net Metering PV project for Soma BayTAQA Arabia
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
Insulation Coordination System for Ezz Steel Factory
220/30 kV S\SSiemens Energy
Scope of work
Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.- Date
- June 24, 2024
Grid Impact Study
6 MWp – PPA PV project in Sharm El- SheikhHassan Allam
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
MIDOR – MIDELEC Power Generation Expansion Project
Hassan Allam
Scope of work
Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
6MWp - Self Consumption PV project for Dina FarmsIRSC
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1 MWp – Net Metering PV project for Nissan Automotive FactoryNissan Automotive
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1MWp – Net Metering PV project for COCA COLA Nasr City FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.- Date
- June 24, 2024
Grid Impact Study
1.1MWp – Net Metering PV project for COCA COLA Tanta FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.- Date
- June 24, 2024
Grid Impact Study
2MWp – Net Metering PV project for COCA COLA Assuit FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Upper Egypt Distribution company.- Date
- June 24, 2024
Grid Impact Study
1MWp – Net Metering PV project for COCA COLA Qaluib FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.- Date
- June 24, 2024
Grid Impact Study
0.75 MWp – Net Metering PV project for COCA COLA Alexandria FactorySolariz Egypt
Scope of work
Preparing the Grid Impact Study (GIS)based on Egyptian Technical Codes and obtain approval from Alexandria Distribution company.- Date
- June 24, 2024
Protection Coordination And Relays Settings In Dina Farms
6 MWp PV projectIRSC
Scope of work
Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.- Date
- June 24, 2024
Grid Impact Study
1 MWp – Net Metering PV project for Soma BaySoma Bay
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.- Date
- June 24, 2024
Grid Impact Study
17.5MWp – Net Metering PV project for Dakahlia PoultryKarm Solar
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.- Date
- June 24, 2024
Grid Impact Study
7 MWp – Self Consumption PV project for Beity FarmArabian Quadra
Scope of work
Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain necessary approvals from The Egyptian Transmission Company.- Date
- June 24, 2024