• Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –Self -Consumption PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –Self-Consumption PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –Self-Consumption PV project in ASCOM
    Taqa Arabia
    Scope of work
    • Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    August 30, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp Net Metering PV - Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp Net Metering PV - Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp Self Consumption PV project - JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from EETC.
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal.
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp – Net Metering PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from TAQA Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp – Net Metering PV project for Soma Bay
    TAQA Arabia
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp – PPA PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp – Net Metering PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Cairo Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp – Net Metering PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp – Net Metering PV project for COCA COLA Assuit Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Upper Egypt Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp – Net Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from South Delta Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp – Net Metering PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    Preparing the Grid Impact Study (GIS)based on Egyptian Technical Codes and obtain approval from Alexandria Distribution company.
    Date
    June 24, 2024
  • Protection Coordination And Relays Settings In Dina Farms

    6 MWp PV project
    IRSC
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp – Net Metering PV project for Soma Bay
    Soma Bay
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Soma Bay Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp – Self Consumption PV project for Beity Farm
    Arabian Quadra
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain necessary approvals from The Egyptian Transmission Company.
    Date
    June 24, 2024