• Grid Impact Study

    2.6 GW Shuaibah PV Plant
    CESI
    Scope of work
    Includes Aggregated model using PSCAD, Bench Marking Study for PSCAD model, andControl Interaction Study as part of the electro-magnetic transient compliance requirements.
    Date
    October 28, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Protection Coordination Study and relay settings study for the MV and HV relays.
    Date
    October 28, 2024
  • Grid Impact Study

    40 MWp PV project in Chad
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Chad’s Technical Codes.
    Date
    October 28, 2024
  • Grid Impact Study

    Harmonics study for Siemens Niat 500 MW Wind Project.
    Siemens Energy
    Scope of work
    Calculate the grid equivalent at point of common coupling for different harmonic orders to optimally design and size the harmonic filters (harmonics Polygon).
    Date
    October 28, 2024
  • Grid Impact Study

    16 MWp –PV project in Arabia cement
    Solariz
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    October 28, 2024
  • Grid Impact Study

    15 MW – self consumption CHP in IPI factory
    Interstate (IPI)
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Grid Impact Study

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    October 27, 2024
  • Grid Impact Study

    17.5MWp - PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    September 11, 2024
  • Grid Impact Study

    35.5 PV project in Zimbabwe
    ElSewedy (EETD)
    Scope of work
    Preparing the Grid Code Compliance Study that include reactive power capability, power quality analysis, Short Circuits Study, Load Flow and Transient study. based on Zimbabwe Technical Codes.
    Date
    August 31, 2024
  • Grid Impact Study

    30 MW – self consumption waste Heat Recovery in Helwan Cement Factory
    Heidelberg
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    August 31, 2024
  • Grid Impact Study

    1.2 MWp –PV project in L’Oreal
    EMPOWER
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    0.8MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    9 MWp –PV project in Nabq
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    8 MWp –PV project in ASCOM
    Taqa Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 31, 2024
  • Grid Impact Study

    0.8 MWp –Self-Consumption PV project in AFCO Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.9MWp –Self-Consumption PV project in Siemens Factory
    Asunim
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    6 MWp –Self-Consumption PV project in Heidelberg Cement factory in Helwan
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Grid Impact Study

    1.5 MWp –Self-Consumption PV project in AOI factory in Helwan
    Arab Organization for Industrialization (AOI)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    August 30, 2024
  • Protection Coordination Studies

    17 MWp, 3.99 MWp, and 1.73 MWp PVs Power Plants
    Integrated Renewable and Sustainable Communities (IRSC)
    Scope of work
    Preparing the protection Coordination Studies for all medium voltage and L.V relays and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Nissan Automotive Factory
    Solar Energy System (SES)
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Robaeya for Textiles
    Robaeya for Textiles / Fortex
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project for JUSHI Fiber Glass Factory
    Enara Energy Group
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Power System Studies for Micro Grids

    5 MW Micro Grid - Engazaat
    Empower
    Scope of work
    1. Load Flow Analysis.
    2. Short circuit Analysis.
    3. Motor starting Analysis.
    4. Power Quality Analysis.
    5. Transient stability Analysis.
    Date
    June 24, 2024
  • Grid Impact Study

    5 MWp – PPA PV project in Sharm El- Sheikh
    Intro Utilities
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.2 MWp –Self-Consumption PV project in Helwan.
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.92 MWp –PV project for NABQ
    TAQA Arabia
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    3.9 MWp –PV project for Soma Bay
    TAQA Arabia
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Insulation Coordination System for Ezz Steel Factory

    220/30 kV S\S
    Siemens Energy
    Scope of work
    Insulation Coordination Study & M.V Cable Sizing Study for Substation Extension including STATCOM & Harmonic Filters Network.
    Date
    June 24, 2024
  • Grid Impact Study

    6 MWp –PV project in Sharm El- Sheikh
    Hassan Allam
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • MIDOR – MIDELEC Power Generation Expansion Project

    Hassan Allam
    Scope of work
    Preparing the Turbine Protection System Study and insuring compliance with the Egyptian regulations’ procedures and system.
    Date
    June 24, 2024
  • Grid Impact Study

    6MWp - Self Consumption PV project for Dina Farms
    IRSC
    Scope of work
    Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Behaira Distribution company.
    Date
    June 24, 2024
  • Grid Impact Study

    1.1 MWp –PV project for Nissan Automotive Factory
    Nissan Automotive
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp - PV project for COCA COLA Nasr City Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1.1MWp –PV project for COCA COLA Tanta Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    2MWp –PV project in COCA COLA (Assuit Factory)
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1MWp –Metering PV project for COCA COLA Qaluib Factory
    Solariz Egypt
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    0.75 MWp –PV project for COCA COLA Alexandria Factory
    Solariz Egypt
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    Grid code compliance and Protection coordination study for 6 MWp PV project in Dina Farms
    IRSC
    Scope of work
    Preparing the protection Coordination and relay settings studies for M.V and L.V network and preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    1 MWp –PV project for Soma Bay
    Soma Bay
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024
  • Grid Impact Study

    17.5MWp – Net Metering PV project for Dakahlia Poultry
    Karm Solar
    Scope of work
    Full EPC scope for reverse power protection system including the design and engineering, installation, testing and commissioning of Relays, C.B and the control system.
    Date
    June 24, 2024
  • Grid Impact Study

    7 MWp –PV project in Beity Farm
    Arabian Quadra
    Scope of work
    preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis).
    Date
    June 24, 2024