Grid Impact Study
17.5 MWp – Net metering PV project in Dakahlia PoultryKarm Solar
Scope of work
Full EPC scope for reverse power protection system including the installation, testing and commissioning of Relays, C.B and the control system.- Date
- September 11, 2024