Development Consultations
Development consultations scope for 30 MW Waste Heat recovery project in Helwan Cement factoryHeidelberg
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Financial Feasibility Study for the project.
- EETC Approval
- Date
- August 31, 2024
Development Consultations
12 MW CHP project in IPI factoryInterstate Paper Industries (IPI)
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Financial Feasibility Study for the project.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
1 MWp PV projectAlmatex
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
2.5 MWp PV project for future tourismMantrac
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Petro bel field in Abu RidesENI and Petro Bel Development
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Clarence of Disco’s approvals.
- Preparing power system studies for the internal network including short-circuit analysis, power quality, transient stability as per petroleum sector requirements and standards.
- Design of the earthing system.
- Lightning analysis.
- Date
- June 25, 2024
Development Consultations
5 MWp PV project in Sharm El SheikhIntro Utilities and Gila Tawakol
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
Development Consultations
3 MWp PV project. for DNM textileInfinity
Scope of work
- Clarence of construction permit and Generation License.
- Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
- Preparing the Environmental Impact assessment Study.
- Date
- June 25, 2024
No Name
NCD Swiss
Scope of work
Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Distribution of electricity in O1 Mall (5 MW capacity)
Tawakol Distribution
Scope of work
Clarence of construction permit and Distribution License for Tawakol Distribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024
Distribution of electricity in walk of Cairo Mall (8 MW capacity)
Intro Distribution
Scope of work
Clarence of construction permit and Distribution License for Intro istribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.- Date
- June 24, 2024