• 1.5 MWp PV project in L’oreal

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • 1.4 MWp PV project in Sidi-Kasem Morocco

    Empower
    Scope of work
    Full owner consultation scope (review and validation) during development, Engineering, Procurement, Installation and testing phase.
    Date
    October 28, 2024
  • Development Consultations

    15 MWp CHP for NCMP Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    Technical assessment of 1.5 MW combined heat and power (CHP) Technology in DAMFI Factory
    Intro Utilities
    Scope of work
    Includes Energy Efficiency Measures and Assessment since CHP is considered as an energy Efficiency technology, Owner consultant to supervise the installation works and recommendation on how to optimize the investment cost and the operation of the system.
    Date
    October 28, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Heidelberg
    Scope of work
    Includes technical review of the project, Statutory approvals and preparing financial feasibility study.
    Date
    October 28, 2024
  • Development Consultations

    2.6 MW – self consumption micro turbines in TCI Sanmar (petrochemical) factory
    TCI Sanmar
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    October 27, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    Includes technical review of the project, Statutory approvals, financial feasibility study and preparing the environmental impact assessment study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), Earthing system design, lightening assessment study, preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project in DNM textile factory
    Infinity
    Scope of work
    Preparing the grid code compliance study and grid impact study that includes (Short-circuit, load flow, reactive power capability, power quality and transient analysis), preparing the environmental impact assessment study and finalising all required statuary approvals.
    Date
    June 25, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall

    5 MW capacity
    Tawakol Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall

    8 MW capacity
    Intro Distribution
    Scope of work
    providing a technical support to assess the electrical infrastructure of the facility, performing necessary testing, recommending necessary actions and finalising all required statutory approvals.
    Date
    June 24, 2024