• Development Consultations

    Development consultations scope for 30 MW Waste Heat recovery project in Helwan Cement factory
    Heidelberg
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. EETC Approval
    Date
    August 31, 2024
  • Development Consultations

    12 MW CHP project in IPI factory
    Interstate Paper Industries (IPI)
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Financial Feasibility Study for the project.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    1 MWp PV project
    Almatex
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    2.5 MWp PV project for future tourism
    Mantrac
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from Canal Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Petro bel field in Abu Rides
    ENI and Petro Bel Development
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    4. Clarence of Disco’s approvals.
    5. Preparing power system studies for the internal network including short-circuit analysis, power quality, transient stability as per petroleum sector requirements and standards.
    6. Design of the earthing system.
    7. Lightning analysis.
    Date
    June 25, 2024
  • Development Consultations

    5 MWp PV project in Sharm El Sheikh
    Intro Utilities and Gila Tawakol
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • Development Consultations

    3 MWp PV project. for DNM textile
    Infinity
    Scope of work
    1. Clarence of construction permit and Generation License.
    2. Preparing the Grid Impact Study (GIS) based on Egyptian Technical Codes and obtain approval from North Delta Distribution company.
    3. Preparing the Environmental Impact assessment Study.
    Date
    June 25, 2024
  • No Name

    NCD Swiss
    Scope of work
    Obtaining the qualification certificated from the Renewable Energy Authority in Egypt for a Swiss company “NCD Swiss” as a certified PV installer in Egypt. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in O1 Mall (5 MW capacity)

    Tawakol Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Tawakol Distribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024
  • Distribution of electricity in walk of Cairo Mall (8 MW capacity)

    Intro Distribution
    Scope of work
    Clarence of construction permit and Distribution License for Intro istribution. This includes verifying all needed procedures & requirements are in compliance with the Egyptian regulations and insure a follow up mechanism.
    Date
    June 24, 2024