• Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Interconnection Study

    8 GW – PV Project in Tabuk (Phase II)
    Assystem
    Scope of work
    Includes Optimum design of the interconnection facilities with HV network, All technical studies including short circuit, power flow, protection coordination and insulation coordination and HV substation design.
    Date
    October 28, 2024
  • Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024