• Interconnection Study

    22 GW PV Project
    Infinity
    Scope of work
    Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.
    Date
    June 25, 2024