Interconnection Study
22 GW PV ProjectInfinity
Scope of work
Scope of work includes: 1. Optimum design of the interconnection facilities with HV network. 2. All technical studies including short circuit, power flow, protection coordination and insulation coordination. 3. HV substation design.- Date
- June 25, 2024