• AIMAGNA and AIBADAA RESEVOIER, NEOM

    NEOM ALRAWAF
    Scope of work
    Design MEP systems using BIM Technology with LOD 350.
    Date
    February 26, 2025
  • EXECUTION OF PARALLEL RUNWAY (PRW) KING SALMAN AIR BASE (CENTRAL SECTOR)

    Kabbani Construction Group Special Projects Division
    Scope of work
    Modelling Infrastructure AGL and Telecome networks of runway using BIM Technology LOD 400.
    Date
    February 26, 2025
  • JEDDAH ISLAMIC PORT INTERNATIONAL

    Extension of Jeddah Islamic Port (107,000 m²) with Additional Contactor Cooling and Refrigerated Container Facilities
    CMA CGM
    Scope of work
    Design Infrastructure networks and building MEP systems.
    Date
    February 26, 2025
  • Zizinia El-Mostakbal Compound

    ARDIC -FOR REAL ESTATE DEVELOPMENT AND INVESTMENT
    Scope of work
    Design Electrical and ELV Infrastructure.
    Date
    August 22, 2024
  • Landfills Project

    Centre of Solid Waste
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • Sorting/Transfer Station for Ehnasia-beni-suef

    Centre of Solid Waste
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • GE LOCOMOTIVES MAINTENANCE WORKSHOP

    Egyptian Railways
    Scope of work
    Design MEP systems.
    Date
    August 22, 2024
  • ALAMEIN LAGOONS

    CHINE STATE CONSTRUCTION ENGRG
    Scope of work
    Schematic design for Electrical, ELV and Mechanical systems.
    Date
    August 22, 2024
  • Model Village in AL-Bayda`a Center -MAKKAH EL MUKARRAMAH-KSA

    ECO ARCH
    Scope of work
    Design MEP Infrastructure Networks.
    Date
    August 22, 2024
  • AL DUWADIMI – AFFIF WTS

    SALINE WATER CONVERSION CORPARATION
    Scope of work
    Preparing technical and financial study for MEP works and infrastructure.
    Date
    August 22, 2024
  • JARIR-AL WASEEL DEVELOPMENT RIYADH, KSA

    Al Quraishi Engineering
    Scope of work
    Design Electrical Infrastructure Networks, Irrigation system. SCADA system.
    Date
    August 22, 2024
  • Grand Central Terminal Caverns

    NYC Metropolitan Transportation Authority
    Scope of work
    BIM Collaboration and Modelling for BMS system LOD 500.
    Date
    August 22, 2024