ADVEC conducted the electrical compliance and grid impact studies for Coca-Cola Assiut’s 2 MWp PV system. The team ensured the solar installation met national PV regulations and integrated smoothly with the factory’s high-demand electrical network.
The study included short-circuit analysis, load flow evaluation, reactive power capability, power quality monitoring, and transient response simulations. These measures ensured reliable and efficient PV operation. The project was completed in 2021.









