ADVEC, on behalf of Empower New Energy, managed the grid compliance and system integration for the 1.2 MWp PV project for L’Oréal in Egypt, delivering a technically robust solar solution. The team completed its technical scope in 2024, starting with a full grid code compliance study to ensure the PV system met all regulatory requirements.
The project reached full completion after ADVEC finalized all studies and approvals, marking it as an accomplished milestone for industrial solar integration. The work included a detailed grid impact study covering short-circuit analysis, load flow, reactive power capability, power quality, and transient assessment, ensuring smooth integration with the local network and stable operational performance.









