ADVEC supports Ghana’s renewable-energy expansion by serving as both technical consultant and owner’s engineer for Empower New Energy’s 2.5 MWp PV micro-grid. The project is still in progress, and ADVEC continues its work through the 2024 implementation phase. The team carried out transient-stability analysis, electromagnetic-transient studies, and protection-coordination reviews to build a resilient system for remote conditions.
ADVEC then designed a modular PV micro-grid architecture that stays stable under shifting generation and load. Their engineering approach strengthens local energy independence and improves the reliability of the community’s power supply.









