For TED Solar’s 1.4 MWp PV project in Coca Cola Heliopolis, ADVEC conducted grid code compliance and grid impact studies. The project is ongoing and is being executed in 2025. ADVEC performed short-circuit analysis, modeled load-flow, evaluated reactive power, assessed power quality, and studied transient stability. These steps ensure the solar system operates efficiently without affecting the existing network.
ADVEC worked closely with the Distribution Company to create a fully approved roadmap for safe and reliable grid connection. This project demonstrates ADVEC’s ability to solve complex renewable energy challenges and strengthens its reputation in industrial solar integration and power system engineering.